4 TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 400 Chestnut Street Tower II May 12, 1982 BLRD-50-438/82-31 M
BLRD-50-439/82-28
- 'y 3
'~ o 2
-4 o
>7
~
U.S. Nuclear Regulatory Commission
.a J D
m E' Region II Attn:
Mr. James P. O'Reilly, Regional Administrator
,[
C2 101 Marietta Street, Suite 3100 3
g Atlanta, Georgia 30303 cc "Sar Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - FAILURE TO PROPERLY REVIEW THE AUXILIARY FEEDWATER SYSTEM DESIGN CRITERIA DIAGEAM - BLRD-50-438/82-31, BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on April 14, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN MEB 8203 Enclosed is our first interim nport.
We expect to submit our next report by August 30, 1982.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 8205210370 820512 0FFICI AL COPY PDR ADOCK 05000430 S
~
An Equal Oppartunity Employer sJ
e e
s.
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FAILURE TO PROPERLY REVIEW THE AUXILIARY FEEDWATER SYSTEM DESIGN CRITERIA DIAGRAM NCR BLN MEB 8203 BLRD-50-438/82-31, BLRD-50-439/82-28 10 CFR 50.55(e)
FIRST INTERIM REPORT Description of Deficiency The last two revisions (R4 and RS) of the auxiliary feedwater system design criteria diagram were not squadchecked by the appropriate organizations as required by TVA's Division of Engineering Design engineering procedure EN DES-EP 3.09, section 5. ?.3 Revision 4 of the design criteria included significant changes.
Interim Progress TVA's Division of Engineering Design will request a review of revisions 4 and 5 from the appropriate organizations.