ML20052G570
| ML20052G570 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 12/02/1981 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Oconnor J COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20052G571 | List: |
| References | |
| NUDOCS 8205180472 | |
| Download: ML20052G570 (2) | |
See also: IR 05000373/1980034
Text
-
..
- _ _ _ _ _ _ _ _ _ _ _
_____
__
_____ _ _
-
.
December 2, 1981
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN: James J. O'Connor
President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to an investigation conducted by Region III during the period
May 1, 1980 to December 8, 1980, at your LaSalle Nuclear Power Station,
Units 1 and 2.
The report setting forth the results of the investigation
is enclosed.
Issuance of this report was delayed while the NRC considered
whether or not to refer the investigation findings, which related to falsifi-
cation of quality records by one of your contractors, to the U.S. Department
of Justice (D0J) for criminal consideration. We have just recently decided
that this matter will not be referred to D0J. Although no referral to DOJ
will be made, the matter is considered to be serious and a copy of our letter
to Tech-Sil, Inc. is enclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter. Such application must be consistent with the
requirements of 2.790(b)(1).
The responses directed by this letter are not subject to the clearance pro-
cedures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
i32051 @ *
Q
j)>& Mf*
c
.
I
~.
..
e
.
.
Commonwealth Edison Company
-2-
December 2, 1981
i
We will gladly discuss any questions you have concerning this investigation.
1
1
.
Sincerely,
4
I
original ~hfoned by
j
Janes G. Keppler
James G. Keppler
Regional Administrator
,
Enclosures:
1.
Investigation Reports
No. 50-373/80-34 and
No.-50-374/80-21
2.
Letter to Tech-Sil, Inc.
dated 11/23/81
cc w/encls:
Cordell Reed, Vice President
Louis 0. De1 George, Director
of Nuclear Licensing
L. J. Burke, Site
,
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
.
Superintendent
'
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
-
Resideni Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
.
i
2
i
i
!
8
!
t
RIII
RIII
R II
RI
'l
9LTU)
gyu)
'
Ig%I
Schultz /np
Warnick
vis
K
r
f/g
11/27/81
lb21 ti
i
l
g
!
-
-
.
.
-
.
.
_ .
_.
.
- .