ML20052G566
| ML20052G566 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 05/11/1982 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8205180467 | |
| Download: ML20052G566 (2) | |
Text
=
TENNESSEE VAL.gggAlb.,
RIIY CHATTANOOGA; TENNdddtt 37401 400 Chestnut Street 'Ibwer gig, 3 0
m%et3 y 11, 1982 BLRD-50-438/82-28 BLRD-50-439/82-25 U.S. Nuclear Regulatory Comission Region II ATIN: James P. O'Reilly, Regional Adninistrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BErIRFTNIE NUCLFAR PIANE UNI'IS 1 AND 2 - VALVES NOP CGLIFIED 'IO APPLICABLE DESIGN RBQUIREMENTS BLRD-50-438/82-28, BLRD-50-439/82 FIRST INTERIM REmar
'Ihe subject deficiency was initially reported to NIC-OIE Inspector R. V. Crlenjak on April 12, 1982 in accordance with 10 CFR 50.55(e) as ERs BIN BLP 8214 and BIN BLP 8215. Enclosed is our first interim report. We expect to subnit our next report by August 18, 1982.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AU1HORITY L. M. Mi s r
Nuclear Licensing Enclosure cc: Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Cmmission Washington, DC 20555 i
g20518 SE ^#
N Zb 37 s
8 /![
An Equal Opportunity Employer
9 m
BETLEFOTTE NUCLIRR PLANP UNITS 1 AND 2 VALVES N(7f QUALIFIED 'IO APPLICABLE DESIGN REQUIRDDTPS 10 CFR 50.55(e)
NCRs BLN BLP 8214 AND BIN BLP 8215 BLRD-50-438/82-28, BLRD-50-439/82-25 FIRST INTERIM REPORP Description of Deficiency
%e 3-inch containment isolation and test valves, manufactured by Target Rock Valve Company, East Farmingdale, New York (VSED-018-ri and VSEB-019-N) and the 4-inch auxiliary feedwater pressure control valves, manufactured by YARNAY Corporation, Blue Bell, Pennsylvania (VSEC-046-A and VSEC-047-B) indicated on nonconformance report Nos. BIN BLP 8214 and BIN BLP 8215, respectively, were purchased as nonactive cmponents. %ese valves should be active components.
Interim Progress TVA will have the valve manufacturers qualify the existing valves as active components.