First Interim Deficiency Rept Re Stress Fractures in Support Brackets in Modules Supplied by Bailey Meter Co,Initially Reported 820414.Util in Process of Determining Corrective Actions.Next Rept by 820810.Also Reportable Per Part 21
ML20052G513
Person / Time
Site: Bellefonte  
Issue date: 05/11/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, NCR-1795, NUDOCS 8205180427
Download: ML20052G513 (2)


Text

_

1 e

4 EEr3 %\\ BEE"hALLEY AUTHORITY

\\

T gs w

,$g M D pA'TTANOOGA.ENNESSCE 37401 j

400 tp h Street Tower II May 11, 1982 BLRD-50-438/82-30 BLRD-50-439/82-27 U.S. Nuclear Regulatory Commission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - STRESS FRACTURES IN SUPPORT BRACKETS IN MODULES SUPPLIED BY BAILEY METER COMPANY - BLRD-50-438/82-30, BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector J. Bryant on April 14, 1982 in accordance with 10 CFR 50.55(e) as NCR 1795. Enclosed is our first interim report. We expect to submit our next report by August 10, 1982. We consider 10 CFR Part 21 applicable to thi.s deficiency.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclo.sure oc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. James McFarland (Enclosure)

Senior Project Manager Babcock & Wilcox. Company P.O.' Box 1260 Lynchburg, Virginia 24505 8205180 W f g.a %

c

$v 1

An Equat Opportunity Employer

_ _=. _..

o o

ENCLOSURE BELLEFONTE NUCLEAh PLANT UNITS 1 AND 2 STRESS FRACTURES IN SUPPORT BRACKETS IN MODULES SUPPLIED BY BAILEY METER COMPANY NCR 1795 BLRD-50-438/82-30, BLRD-50-439/82-27 10 CFR 50.55(e)

FIRST INTERIM REPORT D,escription of Deficiency Connector and support brackets for the printed subcircuit boards in the. plug-in modules of the Reactor Protection System and the Engineered Safety Features Actuation System have stress fractures and show evidence of having been glued. The stress fractures appear to have resulted from the possible improper installation of pop-type rivets that secure the brackets. This deficiency was discovered during routine surveillance inspection of the modules. Approximately 500 connector and support bracket assemblies are involved. The same problem has also been found in the non-Class IE Protection System Auxiliary Cabinets. The assenblies were provided by Bailey Meter Company of Kendrick, Ohio, a subcontractor of Babcock & Wilcox.

Interim Progress TVA has contacted Babcock & Wilcox concerning this problem and is in the process of determining the appropriate corrective actions to take to resolve this deficiency.