ML20052G151
| ML20052G151 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Haddam Neck, 05000000 |
| Issue date: | 05/10/1982 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20052G152 | List: |
| References | |
| GL-81-12, LSO5-82-05-018, TAC-48652, NUDOCS 8205140354 | |
| Download: ML20052G151 (3) | |
Text
.
r G
w'.
Of g
AECE;VED DISTRIBUTION gT
,'5fM%yU13198g ;@
ay 10,1982 Docket NSIC NRC PDR RDiggs 9
[$f4u Local PDR RFerguson
'?
ORB Reading VBeneroya Docket No. 50-213/245 DEisenhut Oh LS05-82-05-018 N
ORAB HSmith CTropf JShea Mr. W. G. Counsil, Vice President Econner Nuclear Engineering and Operations RClark Connecticut Yankee Atomic Power Company DCrutchfield
& Northeast Nuclear Energy Company OELD Post Office Box 270 01&E Hartford, Connecticut 06101 TBarnhart (12)
ACRS (10)
Dear Mr. Counsil:
OPA (Clare Miles)
SUBJECT:
EXEMPTION REQUEST - FIRE PROTECTION RULE SCHEDULAR REQUIREMENTS OF 10 CFR 50.48(c) - HADDAM NECK AND MILLSTONE STATION UNITS 1 AND 2 The Fire Protection Rule, (10 CFR 50.48) published on November 19, 1980, became effective on February 17, 1981, and required the results of certain tasks to be submitted to the Nuclear Regulatory Commission by March 19, 1981. By letter dated March 19, 1981, you applied for exemption from some of these schedular requirements of 10 CFR 50.48(c). The exemption request related to the time allowed to complete a reassessment of the fire protection features for conformance to the specific requirements of Sections III.G and III.L of Appendix R to 10 CFR 50; to evaluate the difference determined for each area; and to design modifications to meet the requirements or provide a justifiable basis by means of a fire hazards analysis for an exemption from such requirements.
For reasons as stated in your exemption request, you requested additional time to complete the above reassessments, evaluations and designs. By letters dated June 23, 1981, November 6,1981 and January 15, 1982, you revised your request.
The Commission has granted your request as described in the enclosed exemption (Enclosure 1). The exemption is conditional upon a requirement that the sub-mittal be complete, as defined in the exemption. Since the submittal date granted by this exemption has already passed and your submittal has already been made, you are given a grace period of 60 days after your receipt of this exemption for supplements to your submittal if necessary.
If the NRC should determine after the 60 days has elapsed that your submittal and any supplements are not complete, you will be found in violation of 10 CFR 50.48(c). Such a violation will be a continuing one from the date granted by the exemption and a civil penalty may "oe imposed for each day the violation continues.
lD2. k g 5/E M L l
8205140354 820510 Si qa PDR ADCCK 05000213 i
y F
PDR omer >
sum.cw >
DQTE )
OFFICI AL R ECOR D C,OPY usm ini_mw Nsc ronu m now ance om
5?
m x
.Gr eir-O W
Mr. W. G. Counsil May 10,19B2 A copy of this exemption is being filed with the Office of the Federal Register for publication. provides a rewording of the request for information included with generic letter 81-12. This rewording is the result of meetings with representative licensees who felt that clarification of the request would help expedite responses.
It does not include any new requests and, there-fore, will not adversely affect licensees' ability to complete the response to generic letter 81-12. provides information regarding our criteria for evaluating exemption requests from the requirements of Section III.G.2 of Appendix R.
Sincerely, Orl@siW W H. R. Denton Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
As stated (3) cc w/ enclosures:
See next page fe e6 oa'ehi#
4\\,
ge
~O r
1d a
ut n
Lf/Jg!82 f f.fl82 l82 G l Q 82 f' y nivy 4/
h1 k.. #3 DL..O
- 5 OELD \\/
Rd I
DL: -
..v t.
,r...
j orner>
..g
.. g q...d.....
...C. T.ro.pf&. 5. E.C.o n. n.e.g.g.. k.g..
TN.amba.g}i..
HS..r(i t.y.g:c.c....
...J,S..h e a.
g
,r
.g...
sunnwe)
DATE>
.. J.....p w..
. J...... :
......y...
nac ronu m oo m sacu cao OFFICIAL RECORD COPY usam mi-sw*o
t
,[**
~
i-
. Mr. W. G. Counsil May 10,1982 CC State of Connecticut William H. Cuddy, Esquire Day, Berry & Howard Office of Policy Management
. Counselors at Law ATN: Under Secretary Energy One Constitution Plaza Division Hartford, Connecticut 06103 80 Washington Street Hartford, Connecticut 06115
- Board of Selectmen Town Hall Resident Inspector Haddam, Connecticut 06103 Haddam Neck Nuclear Power Station c/o U. S. NRC Northeast Nuclear Energy Company East Haddam Post Office ATTN:
Superintendent East Haddam, Connec'ticut - 06423 Millstone Plant P. 0.~ Box 128 U. S. Environmental Protection Waterford, Connecticut 06385 Agency Region I Office
~
f ATTN:
Regional Radiation Representative JFK Federal Bullding Boston, Massachusetts 02203 Resident Inspector c/o U. S. NRC Superintendent
'P O. Box Drawer KK Haddam Neck Plant Niantic, Connecticut 06357 RFD #1 Post Office Box 127E Ronald C. Haynes, Regional Administrator East Hampton, Connecticut 06424 Nuclear Regula' tory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 First Selectman of the Town of Waterford Hall of Records i
l 200 Boston Post Road Waterford, Connecticut 06385 John F. Opeka Systems Superintendent Northeast Utilities Service Ccmpany P. O. Box 270 Hartford, Connecticut 06101 l
Mr. Richard T. Laudenat l
Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Cennecticut 06101 l
l i