Forwards IE Insp Repts 50-259/82-06,50-260/82-06 & 50-296/82-06 on 811226-820125 & Notice of Violation
ML20052G069
Person / Time
Site: Browns Ferry  
Issue date: 03/24/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20052G051 List:
References
NUDOCS 8205140281
Download: ML20052G069 (2)


See also: IR 05000259/1982006

Text

r

.

-

a

MAR 2 41982

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject:

Report Nos. 50-259/82-06, 50-260/82-06, and 50-296/82-06

This refers to the routine safety inspection conducted by Mr. R. F. Sullivan of

this office on December 26, 1981 - January 25, 1982, of activities authorized by

NRC Operating License Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry

facility. Our preliminary findings were discussed with Mr. G. T. Jones, Plant

Superintendent, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain Octivities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In addition to the need for corrective action regarding these specific

violations, we are concerned about the implementation of your management control

systems that permitted their occurrence. Consequently, in your reply, you should

describe in particular those actions taken or planned to improve the effective-

ness of your management control systems.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless yor notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to che

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

e205140281PDRADOCK0$00

9

PDR

G

i

.'

,

.

.

Tennessee Valley Authority

2

MAR 2 4 g

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Lewis, Director

Division of Resident and-

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation-

2.

Inspection Report Nos. 50-259/82-06,

-

50-260/82-06 and 50-296/82-06

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document flanagement Branch

State of Tennessee

1

l

,

l-

t

i

RII

RII

RII

jf f u.t r

4

1$n

-

Ana

ff. GMTC E L C

-

7

.

i

RBu tcher:dt

3/J/82

_3 h/7?

i

3/1%82

3/g/82

7

-

,

(

l

l

_ -

.

- - - . . .

, - - _ . . _ __.,

_

- .

. . .

_ _ - _ , - . _ _ _ _ . ,

. -

.

.

- -

-

- - -