Forwards IE Insp Rept 50-305/82-06 on 820222-24.No Noncompliance Noted
ML20052G052
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/23/1982
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mathews E
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20052G053 List:
References
NUDOCS 8205140268
Download: ML20052G052 (2)


See also: IR 05000305/1982006

Text

f

O'

.

FAPR q 3 y

a

Docket No. 50-305

e

Cb

Wisconsin Public Service

S

9

Corporation

RECEIVED

51

A'ITN:

Mr. E. R. Mathews

97

MAY13

b

Senior Vice President

-

Power Supply and

Nd$M*hCW

'

EC

48

Engineering

9

Post Office Box 1200

Green Bay, WI 54305

Co

/

ro

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

C. J. Paperiello and J. A. Pagliaro of this office on February 22-24, 1982,

of activities at Kewaunee Nuclear Power Plant authorized by NRC Operating

License No. DPR-43 and to the discussion of our findings with you at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Ilowever, this exercise indicated two areas of weakness that need improvement.

They are:

(1) training of health physics technicians to perform release rate

calculations, and

(2)

relocation of the Emergency Operations Facility to a more radiologically

safe area.

We understand you are initiating action to correct these matters.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

8205140268 820423

PDR ADOCK 05000305

1

7

__

.

"

Wisconsin Public Service

2

APR 2 . 082

Corporation-

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of this

letter a written application to this office to withhold such information.

If

your receipt of this letter has been delayed such that less than seven (7) days

are available for your review, please notify this office promptly so that a new

due date may be established.

Consistent with Section 2.790(b)(1), any such

application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part sought to be withheld, and

which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed 'uspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. J. Paperiello, Chief

Emergency Preparedness and

Program Support Branch

Enclosure:

Inspection Report

No. 50-305/82-06(DEPOS)

cc w/ enc 1:

D. C. Hintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector