| Site: | Kewaunee |
| Issue date: | 04/23/1982 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Mathews E WISCONSIN PUBLIC SERVICE CORP. |
| Shared Package | |
| ML20052G053 | List: |
| References | |
| NUDOCS 8205140268 | |
| Download: ML20052G052 (2) | |
See also: IR 05000305/1982006
Text
f
O'
.
FAPR q 3 y
a
Docket No. 50-305
e
Cb
Wisconsin Public Service
S
9
Corporation
RECEIVED
51
A'ITN:
Mr. E. R. Mathews
97
MAY13
b
Senior Vice President
-
Power Supply and
Nd$M*hCW
'
EC
48
Engineering
9
Post Office Box 1200
Green Bay, WI 54305
Co
/
ro
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
C. J. Paperiello and J. A. Pagliaro of this office on February 22-24, 1982,
of activities at Kewaunee Nuclear Power Plant authorized by NRC Operating
License No. DPR-43 and to the discussion of our findings with you at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
Ilowever, this exercise indicated two areas of weakness that need improvement.
They are:
(1) training of health physics technicians to perform release rate
calculations, and
(2)
relocation of the Emergency Operations Facility to a more radiologically
safe area.
We understand you are initiating action to correct these matters.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
8205140268 820423
PDR ADOCK 05000305
1
7
__
.
"
Wisconsin Public Service
2
APR 2 . 082
Corporation-
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of this
letter a written application to this office to withhold such information.
If
your receipt of this letter has been delayed such that less than seven (7) days
are available for your review, please notify this office promptly so that a new
due date may be established.
Consistent with Section 2.790(b)(1), any such
application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed 'uspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. J. Paperiello, Chief
Program Support Branch
Enclosure:
Inspection Report
No. 50-305/82-06(DEPOS)
cc w/ enc 1:
D. C. Hintz, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Inspector
Stanley York, Chairman
Public Service Commission
RI
RIII
RIII
RIII
RIII
faro /so
'nIIb
Ax[on
f
Oestmann
rie lo
-McGregor-
Pa
4/ /82
y gy
Klia