Forwards marked-up FSAR Page Reflecting 820507 Telcon Re Testing During Power Operation.Change Will Be Incorporated in Next FSAR Amend
ML20052F563
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/10/1982
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8205130190
Download: ML20052F563 (2)


Text

.

SOUTH CAROLINA ELECTRIC & GAS COMPANY eost ornce son,e4 COLUMBIA, SOUTH CAROLINA 29218 T. C. Nic Mo t s, J a.

May 10, 1981 w. e........ o, c.w..a x u.. o....

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Carmission Washington, D.C.

20555

Subject:

Virgil C. Sumer Nuclear Station Docket No. 50/395 Testing During Power Operations

Dear Mr. Denton:

As discussed with Mr. William Kane and Mr. John G. Spraul of your staff South Carolina Electric and Gas Conpany provides the attached marked up FSAR-page which reflects agreenents made in a phone conversation of May 7,1982.

This change will be incorporated in the next FSAR amendnent.

If you have any questions, please let us know.

Very truly yours, enn 1 n a v :-

T. C. Nichols, Jr.

RBC:'IG:lkb Attachnent a

E cc:

V. C. Surmer (w/o attach.)

G. H. Fischer (w/o attach.)

I?EC NED'-]

i H. N. Cyrus 8-l T. C. Nichols, Jr.

(w/o attach.)

l N.l 3 M. B. Whitaker, Jr.

p fgtr 08h, }

Df h

J. P. O'Reilly g%ar H. T. Babb D. A. Nauman D

8 C. L. Ligon (NSRC) 6 W. A. Williams, Jr.

(h

(,l R. B. Clary

( $i O. S. Bradham A. R. Koon 6

M. N. Browne G. J. Braddick J. L. Skolds J. B. Knotts, Jr.

B. A. Bursey NPCF File 8205130190 h % 5 PDR ADOCK PDR A

9,

(

The data from these tests is analyzed by the Startup Group, with assis-l 21 tance from SCE&G Nuclear Engineering, Gilbert, Wes ti ngh ou se, or other consultants, as needed, to determine that the acceptance criteria have been met.

The test procedure, test data, and evaluation become part of the plant documentation as described in Section 17.2.17.

The testing program and procedures are further described in Chapter 14

~

The SCE&G QA organization conducts audits and surveillance at the Virgil h

C. Summer Nucicar Station to assure the continued existence and proper implementation of the testing procedures.

17.2.11.3 Testing During Power Operations 1 *4 The Manager, Virgil C. Sunuser Nuclear Station, is responsible for developing a test program which demonstrates the continued acceptability and operability of the Virgil C. Sunuser Nuclear Station without endangering the health of safety of the public.

(

Ihe testing procedures are the responsibility of the Assistan't Managers

~

of Support and Maintenance Services for equipment and systems when they are unavailable for operation, and of the Assistant Manager, Opers* ions f or equipment and systems when they are in operation or available for opera tio n.

The tests will verify that plant nuclear, thermal, hydraulic, and other operating parameters remain within the acceptance limits determined

('

-35 during design and the initial test qualysed by

\\

32.

d p.ag,g, a sedere*/*~r O*~ the otsurreThe test data are ind per orogram.

as group ti" e"icm d by th: plant staf f7and/or Nuclea r Engineering, with assistance from consultants, as needed, to determine that the acceptance criteria are met, and reports are prepared to record the data, analysis,

[

and evaluation.

The reports become part of the plant records, and are maintained as described in Section 17.2.17.

f 17.2-38 AMENDMENT ftM y

  • P3ttt, 1982