Addl Response to FOIA Request for Five Catergories of Documents Re Atlas Machine & Iron Works,Inc
ML20052F367
Person / Time
Site: 05000000, Hartsville, Phipps Bend
Issue date: 04/27/1982
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Tyrus Wheeler
PETTIT & MARTIN
Shared Package
ML20052F368 List:
References
FOIA-82-20 NUDOCS 8205120389
Download: ML20052F367 (6)


Text

. _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _

f0lL-olb i

[

b, UNITED STATES g

NUCLEAR REGULATORY COMMISSION

,N ny WASWNGTON, D. C. 20555 9

% *****/

g

\\

NECSNgg April 27, 1982 pp Q~ narf 0I982% $

~~

s Thomas C. Wheeler, Esquire k

8 Pettit & Martin 1800 Massachusetts Avenue, N.W.

IN RESPONSE R m

Washington, DC 20036 TO FOIA-82-20

Dear Mr. Wheeler:

This is in further reply to your letter dated January 19, 1982, in which you requested, pursuant to the Freedom of Information Act, copies of five categories of documents concerning the Atlas Machine & Iron Works, Inc., Gainesville, Virginia.

The following responds to each category of your request:

1.

Reports submitted to NRC by TVA under 10 CFR Part 21 or 950.55(e)

Appendix A contains a list of applicable documents which are already in the NRC Public Document Room (PDR) or which are being placed in the PDR. Note that although the five inspection reports concern Atlas, they do not specifically refer to Part 21 or s50.55(e).

2.

Documents submitted to NRC by TVA regarding Atlas' quality assurance program or procedures There are approximately 1,300 pages of exhibits in the TVA

v. Atlas Machine and Iron Works, Inc. litigation which have been provided to NRC. Atlas already has copies of these documents, and additional copies are not being provided here.

3.

All other documents submitted to NRC by TVA Appendix B lists 27 construction details drawings prepared by C. F. Braun and Company for GE/TVA.

It is our understanding that Atlas should have copies of all of these drawings.

In addition, the following document is enclosed:

C. F. Braun and Co/ General Electric /TVA Contract Specification 300-44 dated 2/25/77 with Field Change Requests 625 and 433

/

8205120389 820427 PDR FOIA WHEELER 82-20 PDR

l Thomas C. Wheeler, Esquire We are consulting with TVA on one other document, and will advise you subsequently of our determination.

4.

All documents prepared by NRC The documents listed on Appendix C are enclosed.

The NRC is withholding from public disclosure the remainder of its investigative file, not otherwise identified. above, entitled Investigative Case File 2F038 -

Subject:

Atlas Machine and Iron Works.

This file consists of approximately 20 pages of memoranda, notes, and records of conversations.

In addition, we are withholding the two documents listed on Appendix D.

This information is being withheld from public disclosure pursuant to Exemptions (5) and (7)(A) of the Freedom of Information Act (5 U.S.C.

552(b)(5) and (7)(A)) and 10 CFR 9.5(a)(5) and (7)(1) of the Commission's regulations, because disclosure of the information would interfere with an ongoing enforcement proceeding or because the information consists of predecisional advice, opinions, and recommendations.

5.

Eligibility lists to participate on nuclear construction projects The NRC does not maintain vendor eligibility lists to participate on nuclear construction projects.

Pursuant to 10 CFR 9.9 and 9.15 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for the denial of this case file are the undersigned and Mr. James P. O'Reilly, Regional Administrator, Region II.

The person responsible for the denial of the documents listed on Appendix D is Mr. James J. Cummings, Director, Office of Inspector and Auditor.

The denial by Mr. OReilly and myself may be appealed to the Commission's Executive Director for Operations within 30 days from the receipt of this letter.

As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision." The denial by Mr. Cummings may9e appealed to the Commission and should be addressed to the Secretary of the Commission.

Sincerely,

.kYW

// J. Mi F5

, Director

['/

Division of Rules and Records

~

Office of Administration

Enclosures:

As stated

Re: F01A-82-20 Appendix A Letters from L. M. Mills (TVA).to J. P. O'Reilly (NRC) dated 1.

6/4/80 HTN QEB 80-01, PBN QEB 80-01 (2 pages) 2.

9/19/80 HTN QEB 80-01, PBN QEB 80-01 (1 page) 3.

12/18/80 HTN QEB 80-01, PBN QEB 80-01 (3 pages)

4. ~4/27/81 HTRD-50-518/81-10 (2 pages) 5.

6/2/81 HTRD-50-518/81-10 (3 pages) 6.

6/17/81 HTRD-50-518/81-13, -520/81-11 (2 pages) 7.

6/18/81 PBRD-50-553/81-14 (2 pages) 8.

9/P2/81 HTRD-50-518/81-13, -520/81-11 (3 pages) 9.

10/1/81 HNP-A-087, HNP-A-108, HNP-A-109, HNP-A-115, and SX-19 (1page))

10.

10/9/81 HTRD-50-518/81-13, -520/81-11 (3 pages) 11.

10/30/81 PBRD-50-533/81-14 (1 page) 12.

11/16/81 HTRD-50-518/81-13, -520/81-11 (1 page) 13.

12/10/81 HTRD-50-518/81-29, -519/81-22, -520/81-28, -521/81 PBRD-50-553/81-31, -554/81-24 (2,pages) 14.

1/26/81 HTRD-50-518/81-13, -520/81 P8RD-50-553/81-14 (3pages)

Inspection Reports 15.

7/28/80 Report Nos. 50-518/80-13, etc. (7 pages) q 16.

4/10/81 Report Nos. 50-518/81-05, etc. (8 pages) 4 17.

12/8/81 Report Nos. 50-518/81-21, etc. (5 pages) 18.

7/21/80 Report Nos. 50-553/80-10, etc. (12 pages) t 19.

10/1/81 Report Nos. 50-553/81-07, etc. (10 pages) l i

-l I

Re: F01A-82-20 Appendix B Twenty-seven Construction Details Drawings Prepared by C. F. Braun and Company for GE/TVA 18 Drawings entitled " Reactor Euilding Wall Embedded Details" Drawing No.

Rev Drawing No.

Rev S-041 B 3

S-041 N 3

5-041 C 2

S-041 P 1

S-041 D 5

S-041 R 3

S-041 E 5

S-041 5 3

S-041 F 4

S-041 I 3

S-041 H 3

S-041'U 1

S-041 J 3

S-041 W 3

S-041 K 3

S-041 X 2

S-041 M 3

S-041 Y l

2 Drawings entitled " Reactor Building Drywell Wall Embedded Details" Drawing No.

Rev S-041 G 2

S-041 Z 0

2 Drawings entitled " Reactor Building Drywell Wall Embedded Details" Drawing No.

Rev S-050 A 1

S-050 B 2

1 Drawing entitled " Reactor Building Drywell Head Embedment" S-067 Rev. 2 3 Drawings entitled " Reactor Building, Shield Building Steam Tunnel Embedment" Drawing No.

Rev S-161 A 2

S-161 B 2

5-161 C 4

1 Drawing entitled " Reactor Island, All Building, New Structural Steel Shapes" S-915 Rev. 1 v-A$

Re: F01A-82-20 f

Appendix C HRC Documents:

).

5/13/80 Telephone Report by R. W. Wright (1 page) 2.

5/13/80 Daily Report Entry (1 page) 3.

Undated (should be 5/13/80) Form memo from C. E. Murphy Region II to Chief, Vendor Inspection Branch, Region IV (1 page) 4.

5/13/80 Action Item Control Form F02500124 (1 page) 5.

9/4/80 Memo from U. Potapovs, Region IV to C. E. Murphy, Region II (1 page) 6.

5/21/81 Daily Report Entries (1 page)'

7.

6/1/81 Daily Report Entry (1 page) 8.

9/16/81 Memo from R. Lewis to C. Alderson et. al. (1 page) 9.

Undated Inspector's Notes (2 pages) 10.

10/2/81 Memo from A. Herdt to C. Murphy (2 pages) 11.

Undated Polaroid photographs of Hartsville containment including steam tunnel, access, and piping penetrations.

Copies of 14 low quality photographs (3 pages) e I

i e

Re:

F01A-82-20 1

Appendix D 4

1.

11/9/81 Memo from Resner to File,

Subject:

Atlas Machine and i

Iron Works 2.

6/13/82 Memo from Resner to File,

Subject:

Atlas Nachine and

{

Iron Works

-i h

f 1

6 Y

h i

l

?

I i

l i

l

[

I

?

I i

e t

t i

l 4

5 1

i-b I

[

,----,,,---n-n,

o

.P P h. i i IT & M ARTIN SA~,R.NC,6CO O,,,CE LOS ANoELES O,F,cE s%OO MONTGOMERY STREET 2049 CENTURY PARK EAST ATTORNEYS AT L.\\W 0003 FRANCISCO. CALIFORNIA 94111 LOS ANGELES. CALIFORN4A 90007 A PARTNERSHIP INCLUDING PROFESSIONAL CORPORAT!ONS 1800 M ASSACHUSETTS AVENUE. N.W.

DALLAS OFFICE SAN JOSE OFTICE Sto TEnAS COMMERCE DANK TOWER. LB183 WASHINGTON D. C. 20036 121 PARK CENTER PLAZA, SUITE 200 DALLAS. TEXAS 752Og SAN JOSE, CALIFORNIA 95113 T EL E C OPIE R: 42028 785-!!!S3 g,,,,

,,,g, sana. T.e v.so (202) 785 5153 LONDON OFFICE 44 REEVE S MEWS LONDON. W1. ENGLAND THOMAS C. WHEELER

~ ' " ~

January 19, 1982 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Daniel J. Donoghue FREEDOM OF INFORMATION Director ACT, REQUEST Office of Administration

[

-h U.S.

Nuclear Regulatory Commission

@4.4

/ -2. 5 -P2 Washington, D.C.

20555 Re:

Freedom of Information Act Request

Dear Mr. Donoghue:

Pursuant to the Freedom of Information Act, 5 U.S.C.

S 552, and your agency's implementing reg-ulations, 10 C.F.R.

S 9.3 et seq. (1981), I hereby request copies of each of the following documents regarding Atlas Machine & Iron Works, Inc., Gaines-ville, Virginia (hereinafter referred to as "the Company") :

1.

All written reports submitted to the NRC by the Tennessee Valley Authority under 10 C.F.R.

S 50.55(e) or 10 C.F.R. Part 21 regarding alleged deficiencies in the Company's performance on nuclear construc-tion projects located at Hartsville or Phipps Bend, Tennessee.

2.

All documents submitted to the NRC by the Tennessee Valley Authority regarding the Company's quality assurance program or procedures.

3.

All other documents of any kind submitted to the NRC by the Tennessee Valley Author-ity evaluating or commenting upon the Company's performance on nuclear construc-tion projects located at liartsville or Phipps Bend, Tennessee.

l

'l 1

J y,./

PETTIT & MARTIN I

Mr. Daniel J.

Donoghue January 19, 1982 Page two 4.

All documents prepared by any employee of the NRC in response to, relating to, or commenting upon any document referenced in Categories 1, 2, or 3 above.

5.

All documents or lists maintained by the NRC regarding the Company's eligibility to participate on nuclear construction projects, or the Company's acceptability as a supplier of fabricated steel struc-tures for nuclear construction projects.

In accordance with 10 C.F.R. S 9.14, I agree to pay the applicable fees for the processing of this request.

If you have any questions, please call me at 785-5153.

Your attention to this request is appreciated.

Sincerely,

-F j

,,}

Thomas C. Wheeler TCW:sv i

~*