ML20052F123

From kanterella
Jump to navigation Jump to search
Confirms 760603 Telcon Re Environ Qualification of Safe Shutdown Equipment & Instrumentation.Instrumentation Listed in Table 6.1-1 of FSAR Amend 18 Added to Safe Shutdown List
ML20052F123
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/03/1976
From: Walker R
PUBLIC SERVICE CO. OF COLORADO
To: Brooke Clark
Office of Nuclear Reactor Regulation
Shared Package
ML19308A354 List:
References
FOIA-82-149 P-76120, NUDOCS 8205120136
Download: ML20052F123 (1)


Text

-- - - - - - - - - - - - - - - -

i - . . ._ ,3, 4

,y- -

g pumie senice comp:my ce comaso e P. O. Box 361, Platteville, CO 80651 N

s

@Q June 3, 1976 Fort St. Vrain Unit No. 1 P-76120 Mr. Bob Clark, Chief Special Reactors Branch Division of Project Management U. S. Nuclear Regulatory Co= mission Washington, D.C. 20555 Docket #50-267

Dear Mr. Clark:

Subj ect: Environmental Qualification of Safe Shut Down Equipment and Instrumentati(

This is to confirm the telephone conversation of June 3, concerning environmental qualification of instrumentation and equipment necessary to facilitate safe shut 1 down of the facility in the event of a steam line or feedwater line rupture. f As indicated in the con'versation, certification is in hand for all instrumentation I and equipment listed in Table 6.1-1 of our response to question 6.1 contained in amendment 18 to the FSAR. That instrumentation that has been added to the '

safe shutdown list as the result of our evaluation and assignment of cables as being essential shall be environmentally qualified as rapidly as the quali-fications can be obtained. At the time when we exceed 40% power those instru-ments remaining to be environmentally qualified will be reviewed with I&E and all environmental certifications shall be in hand prior to resuming operation

  • following the first refueling.

Yours very truly,

, R. F. Walker j Vice President RFW:if t

L-' -

_ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . -