ML20052F102
| ML20052F102 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 04/02/1982 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Steven Lynch HOLMES & STARR |
| Shared Package | |
| ML19308A354 | List: |
| References | |
| FOIA-82-149 NUDOCS 8205120118 | |
| Download: ML20052F102 (5) | |
Text
eD& oho a
v... y u.m%g Lpge g,
UNITED STATES 2
'a NUCLEAR REGULATORY COMMISSION E
,l WASHING T ON, D. C. 20555
~
g-
/
e n __, 7 April 2,1982
~b
/
r, Docket 50-267 El-
+%
=
Stephen F. Lynch, Esquire
\\gg s
Holmes & Starr Suite 2440 s
717 Seventeenth Street IN RESPON.
Denver, CO 80202-3362 TO F01A-82'l
Dear Mr. Lynch:
This is in response to your letter dated March 16, 1982 in which you requested, pursuant to the Freedom of Information Act,16 categories of records pertaining to the Fort St. Vrain Nuclear Power Plant.
This confirms information relayed during subsequent telephone conversations between you and Linda Robinson on March 22 and 23, 1982.
Available records pertaining to categories one through four and 13 through 15, as identified on the enclosed appendix, are enclosed.
You will be billed in the amount of $56.10 by our Division of Accounting for the cost of searching for and reproducing these records.
(These chargas includes $5.00 per hour for eight-and-one-half hours of search time and five cents per page for 272 pages, as provided in 10 CFR 9.14.)
The NRC does not collect and maintain records requested under categories five through 12.
The NRC may view records during inspections, or make observations during inspections, which may be noted in inspection reports but not further documented.
Therefore, as a result of the telephone conversations noted above, you are currently attempting to obtain existing requested records from the Public Service Company of Colorado.
With regard to category 16, you were informed that you can obtain a copy of the report. on this subject, "NRC Licensee Assessments", from the Government Printing Office Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission, Washington, DC 20555, upon prepayment of the $4.00 price.
The NRC maintains a limited collection of records in Local Public Document Rooms (LPDR) near sites of the nuclear power plants regulated by NRC.
These records are available for public inspection and copying.
The LPDR for the Fort St. Vrain plant is housed in the Greeley Public Library, City Complex Building, Greeley, Colorado 80631.
Inasmuch as 8205120118 820402
~
l i
g-Stephen F. Lynch, Esquire l the NRC routinely places in the LPDR the types of records you requested, we suggest you visit the LPDR in the event you becone interested in additional records on this plant in the future.
Sincerely, j
. M. Felton, Director d7 j
Division of Rules and Records t
Office of Administration
Enclosures:
As stated r
h I
h l
I I
t
Re:
F01A-82-149 y.
Appendix Categories 1 and 2 1.
6/18/81 PSC letter P-81172 to Seyfrit, " Seismic Piping System Redocumentation Program Status". (2 pages) 2.
1/4/82 PSC letter P-82004 to Collins, " Seismic Piping System".
(3 pages)
Category 2 1.
1/20/81 PSC letter P-81019 to Seyfrit, " Supports for 2" and Under Piping".
(3 pages)
Category 3 A.
3/8/79 Letter to PSC from Seyfrit transmitting IE Bulletin 79-02. (1 page) 2.
3/8/79 IE Bulletin 79-02. (5 pages) j 3.
6/21/79 Letter to PSC from Seyfrit transmitting IE Bulletin t
79-02, Revision 1. (1 page) l 4.
6/21/79 IE Bulletin 79-02, Revision 1. (11 pages) 5.
7/3/79 PSC letter P-79143, "IE Bulletin 79-02, Base Plate Designs Using Concrete Expansion Anchor Bolts". (2 pages) 6.
8/20/79 IE Bulletin 79-02, Revision 1, Supplement 1. (5 pages) 7.
8/22/79 Letter to PSC from Seyfrit transmitting IE Bulletin 79-02, Revision 1, Supplement 1. (1 page) 8.
9/14/79 PSC Letter P-79209, "IE Bulletin 79-02 Base Plate Design Using Concrete Expansion Anchor Bolts. (4 pages) 9.
11/8/79 Letter to PSC from Seyfrit transmitting IE Bulletin 79-02, Revision 2. (1 page) 10.
11/8/79 IE Bulletin 79-02, Revision 2 (11 pages) 11.
12/12/79 PSC letter P-79297, "I&E Bulletin 79-02 Revision 2 Base Plate Design Using Concrete Expansion Anchor Bolt'.'.
(2 pages) i i
Re: F01A-82-149 j.
Appendix Category 3 B.
3/30/79 Letter to PSC from Seyfrit transmitting IE Bulletin 79-04. (1 page) 2 3/30/79 IE 3ulletin 79-04. (6 pages) 3, 5/4/79 PSC letter P-79098, "IE Bulletin No. 79-04". (2 pages)
_ Category 4 1.
5/10/79 PSC letter P-76104, " Attachment A&B to Replace P-76034 Transmitt&l".
(NRC files do not contain missing page 10.)
(37pages) 2.
6/3/76 PSC letter P-76120, " Environmental Qualification of Safe Shut Down Equipment and Instrumentation". (1 page) 3.
6/14/76 Unusual Event Report 50-267/76/04. (6 pages) 4.
12/15/76 PSC letter P-76276, " Docket No. 50-267". (1 page) 5.
11/17/77 PSC letter P-77229, " Supports for 2" arid Under Piping".
(1 page) 6.
12/23/80 PSC letter P-80442, " Safety Related Piping System Audit". (7 pages)
Category 13 1.
3/23/79 Letter to PSC from Seyfrit transmitting IE Information Notice 79-06. (1 page) 2.
3/23/79
~IE Information Notice 79-06. (4 pages)
Category 14 1.
7/2/79 Letter to PSC from Seyfrit transmitting IE Bulletin 79-14. (1 page) 2.
7/2/79 IE Bulletin 79-14. (9 pages) 3.
7/18/79 Letter to PSC from Seyfrit transmitting a replacement page 2 for IE Bulletin 79-14. (1 page) 4, 8/15/79 Letter to PSC from Seyfrit transmitting supplement to IE Bulletin 79-14. (1 page)
Re: F0IA-82-149 s.
Appendix Category 14 5.
8/15/79 Supplement IE Bulletin 79-14. (6 pages) 6.
9/7/79 IE Bulletin 79-14 Supplement 2. (6 pages) 7.
10/15/79 PSC Letter P-79238, " Safety Related Piping System Audit". (3 pagea) 8.
2/15/80 PSC Letter P-80029, " Safety Related Piping System Audit". (4 pages) 9.
4/23/80 PSC Letter P-80091, " Safety Related Piping System Audit". (4 pages) 10.
6/30/80 PSC Letter P-80194, " Safety Related Piping System Audi t". (3 pages) 11.
8/25/80 PSC Letter P-80282, " Safety Related Piping System Audit". (4 pages) 12.
10/28/80 PSC Letter P-80380, " Safety Related Piping System Audit". (3 pages) 13.
12/23/80 PSC Letter P-80442, " Safety Related Piping System Audit". (3 pages) 14.
6/18/81 PSC Letter P-81172, " Seismic Piping System Redocumentation Program Status". (2 pages)
(Additional pertinent documents are listed under Category 15. )
Category 15 1.
8/1/79 PSC Letter P-79161, "IE Bulletin 79-14 Response".
(73 pages) 2.
9/4/79-PSC Letter P-79198, " Audit of Safety Related Piping Systems". (2 pages) 3.
12/4/79 PSC Letter P-79292, " Review of Safety Related Piping Systems Audited for I&E Bulletin 79-14". (22 oages) 4.
12/14/79 Letter to PSC from Seyfrit requesting supplemental reply to IE Bulletin 79-14. (1 page) 5.
8/25/80 PSC Letter P-80282, " Safety Related Piping System Audi t". (4 pages)