Forwards IE Insp Repts 50-329/82-06 & 50-330/82-06 on 820317-19 & Notice of Violation
ML20052E694
Person / Time
Site: Midland
Issue date: 04/26/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20052E695 List:
References
NUDOCS 8205110357
Download: ML20052E694 (2)


See also: IR 05000329/1982006

Text

f

,

..

'APR 2g y2

A

,

9)

Sg E%

Docket No. 50-329(DETP)

ED

Docket No. 50-330(DETP)

-

m

g

bk [2

"

Consumers Power Company

NITN:

Mr. James W. Cook

,

Vice President

g

Midland Project

j,

1945 West Parnall Road

N

g

Jackson, MI 49201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

R. Gardner and R. B. Landsman of this office on March 17-19, 1982, of ac-

tivities at Midland Nuclear Power Plant, Units 1 and 2, authorized by NRC

Construction Permits No. CPPR-81 and No. CPPR-82 and to the discussion of

our findings with Mr. Marguglio at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

B205110357 y h 9

PDR ADOCK

PDR

pll

..

Consumers Power Company

2

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from pubile disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document Room.

We will gladly discuss any questions ~you have concerning this inspection.

Sincerely,

"cr!cinal tignel by C.E. Nerof f s95

C. E. Norelius, Director

Division of Engineering and

Technical Programs

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Reports

No. 50-329/82-06(DETP)

and No. 50-330/82-06(DETP)

cc w/encls:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

The Honorable Charles Bechhoefer, ASLB

The Honorable Jerry Harbour, ASLB

The Honorable Frederick P. Cowan, ASLB

The Honorable Ralph S. Decker, ASLB

Michael Miller

Ronald Callen, Michigan

Public Service Commission

Myron M. Cherry

Barbara Stamiris

. Mary Sinclair

Wendell Marshall

Colonel Steve J. Gadler (P.E.)

RIfj/Ij

RIII

R I

RI

RI

RII

RIII

(W4

4'd

Gardner/so

Lanc.

an

ams

e

oyd

Jhugu

Norelius

4/9/82

LP

.