ML20052E694
| ML20052E694 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 04/26/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20052E695 | List: |
| References | |
| NUDOCS 8205110357 | |
| Download: ML20052E694 (2) | |
See also: IR 05000329/1982006
Text
f
,
..
'APR 2g y2
A
,
9)
Sg E%
Docket No. 50-329(DETP)
Docket No. 50-330(DETP)
-
m
g
bk [2
"
Consumers Power Company
NITN:
Mr. James W. Cook
,
Vice President
g
Midland Project
j,
1945 West Parnall Road
N
g
Jackson, MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
R. Gardner and R. B. Landsman of this office on March 17-19, 1982, of ac-
tivities at Midland Nuclear Power Plant, Units 1 and 2, authorized by NRC
Construction Permits No. CPPR-81 and No. CPPR-82 and to the discussion of
our findings with Mr. Marguglio at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
B205110357 y h 9
PDR ADOCK
pll
..
Consumers Power Company
2
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from pubile disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document Room.
We will gladly discuss any questions ~you have concerning this inspection.
Sincerely,
"cr!cinal tignel by C.E. Nerof f s95
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-329/82-06(DETP)
and No. 50-330/82-06(DETP)
cc w/encls:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
The Honorable Charles Bechhoefer, ASLB
The Honorable Jerry Harbour, ASLB
The Honorable Frederick P. Cowan, ASLB
The Honorable Ralph S. Decker, ASLB
Michael Miller
Ronald Callen, Michigan
Public Service Commission
Myron M. Cherry
Barbara Stamiris
. Mary Sinclair
Wendell Marshall
Colonel Steve J. Gadler (P.E.)
RIfj/Ij
RIII
R I
RI
RI
RII
RIII
(W4
4'd
Gardner/so
Lanc.
an
ams
e
oyd
Jhugu
Norelius
4/9/82
.