APR 2 2 1982
9
%
/
RECElvso
47
MAYI0198h '1
Docket No. 50-266
"
Mgaumen
Docket No. 50-301
Wisconsin Electric Power Company
-
\\
ATIN:
Mr. Sol Bnstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
This refers to the management meeting conducted by me and members of my
staff on February 25, 1982, at the Point Beach Nuclear Plant, with
Mr. C. W. Fay and other members of your staff.
The enclosed report identifies the areas discussed during the meeting. As
stated in the report, the meeting was held to discuss Region III concerns
about indications of a deterioration in the level of performance at the
Point Beach Nuclear Plant.
No items of noncompliance with NRC requirements were identified during the
course of this meeting.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed meeting report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven
(7) days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the
owner of the information which identifies the document or part sought to be
withheld, and which contains a full statement of the reasons which are the
bases for the claim that the information should be withheld from public
disclosure. This section further requires the statement to address with
8205110300 820422
PDR ADOCK 05000266
"""
s 1/i Sf6/
.
.
Wisconsin Electric Power Company
2
specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-
tion sought to be withheld shall be incorporated as far as possible into
a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter and
the enclosed meeting report will be placed in the Public Document Room.
If you have any questions regarding the enclosed report please feel free
to call us.
Sincerely,
noitgtdal signed by R.L. Spessard"
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosure: Meeting Report
No. 50-266/82-03(DPRP);
and 50-301/82-03(DPRP)
cc w/ enc 1:
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief Boiler
Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
RII
RIII
RIII
RI I
e
'1d
/jp
n
n
St eter
Sp anasi
4/21/82
Y/2) M
j
/j d'
.
m