Forwards IE Mgt Meeting Repts 50-266/82-03 & 50-301/82-03 on 820225.No Noncompliance Noted
ML20052E637
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/22/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20052E639 List:
References
NUDOCS 8205110300
Download: ML20052E637 (2)


See also: IR 05000266/1982003

Text

.

,

APR 2 2 1982

9

%

/

RECElvso

47

MAYI0198h '1

Docket No. 50-266

"

Mgaumen

Docket No. 50-301

Wisconsin Electric Power Company

-

\\

ATIN:

Mr. Sol Bnstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 53201

This refers to the management meeting conducted by me and members of my

staff on February 25, 1982, at the Point Beach Nuclear Plant, with

Mr. C. W. Fay and other members of your staff.

The enclosed report identifies the areas discussed during the meeting. As

stated in the report, the meeting was held to discuss Region III concerns

about indications of a deterioration in the level of performance at the

Point Beach Nuclear Plant.

No items of noncompliance with NRC requirements were identified during the

course of this meeting.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed meeting report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven

(7) days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with Section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the

owner of the information which identifies the document or part sought to be

withheld, and which contains a full statement of the reasons which are the

bases for the claim that the information should be withheld from public

disclosure. This section further requires the statement to address with

8205110300 820422

PDR ADOCK 05000266

"""

s 1/i Sf6/

.

.

Wisconsin Electric Power Company

2

specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-

tion sought to be withheld shall be incorporated as far as possible into

a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter and

the enclosed meeting report will be placed in the Public Document Room.

If you have any questions regarding the enclosed report please feel free

to call us.

Sincerely,

noitgtdal signed by R.L. Spessard"

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosure: Meeting Report

No. 50-266/82-03(DPRP);

and 50-301/82-03(DPRP)

cc w/ enc 1:

G. A. Reed, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief Boiler

Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission

RII

RIII

RIII

RI I

e

'1d

/jp

n

n

St eter

Sp anasi

4/21/82

Y/2) M

j

/j d'

.

m