MONTHYEARML20212J1581999-09-30030 September 1999 Order Approving Transfer of License & Conforming Agreement. Orders That License Transfer Approved,Subj to Listed Conditions ML20205D4901999-02-22022 February 1999 Transcript of 990222 Informal Public Hearing on 10CFR2.206 Petition in Rockville,Md.Pp 1-105.Supporting Documentation Encl ML20198D9711998-11-0909 November 1998 Petition Per 10CFR2.206 Requesting That Facility Be Immediately Shut Down & OL Be Suspended or Modified Until Such Time That Facility Design & Licensing Bases Properly Updated to Permit Operation with Failed Fuel Assemblies ML20155F4561998-08-26026 August 1998 Demand for Info Re False Info Allegedly Provided by Wh Clark to Two NRC Licensees.Nrc Considering Whether Individual Should Be Prohibited from Working in NRC-licensed Activities for Period of 5 Yrs ML20236V5261998-07-20020 July 1998 Computer Access & Operating Agreement Between Cleveland Electric Illuminating Co & NRC PY-CEI-NRR-2284, Comment Opposing Proposed Generic Communication, Lab Testing of Nuclear-Grade Activated Charcoal1998-05-21021 May 1998 Comment Opposing Proposed Generic Communication, Lab Testing of Nuclear-Grade Activated Charcoal ML20216B5111998-04-0909 April 1998 Order Imposing Civil Monetary Penalty.Denies Request for Remission of Violation C,Ea 97-430 & Orders Licensee to Pay Civil Penalty in Amount of $50,000 within Next 30 Days PY-CEI-NRR-2269, Comment on Proposed Rule 10CFR50.NRC Should Demonstrate That Not Only Is Code Process Flawed,But That Proposed Change Justified from Cost Versus Safety Protective1998-04-0303 April 1998 Comment on Proposed Rule 10CFR50.NRC Should Demonstrate That Not Only Is Code Process Flawed,But That Proposed Change Justified from Cost Versus Safety Protective ML20217J0661998-03-11011 March 1998 Order Approving Application Re Merger Agreement Between Dqe, Inc & Allegheny Power System,Inc ML20216G3821998-03-11011 March 1998 Order Approving Application Re Merger Agreement Between Duquesne Light Co & Allegheny Power Systems,Inc ML20198P9311997-11-0707 November 1997 Comments of American Municipal Power-Ohio,Inc.NRC Should Require Allegheny Power Sys,Inc to Affirm That Capco Antitrust License Conditions Will Be Followed ML20134L3401997-01-22022 January 1997 Resolution 96-R-85, Resolution Supporting Merger of Centerior Energy Corp & Ohio Edison Under New Holding Co Called Firstenergy ML20133B6941996-12-18018 December 1996 Submits Ordinance 850-96 Re Approval of Merger of Centerior & Oh Edison Into Firstenergy ML20135F4731996-12-0606 December 1996 Memorandum & Order CLI-96-13.* Commission Reverses & Vacates ASLB LBP-95-17 Which Granted Motion for Summary Disposition Submitted by Ocre & Hiatt.W/Certificate of Svc.Served on 961206 ML20132A8461996-12-0202 December 1996 Resolution 20-1996 Supporting Merger of Ohio Edison & Centerior Corp Under New Holding Company Called Firstenergy ML20134M6191996-10-28028 October 1996 Proclamation of Support by City of Sandusky,Oh Re Merger of Ohio Edison and Centerior Energy Corp ML20112J8281996-06-18018 June 1996 Licensee Reply Brief on Review of Licensing Board Decision LBP-95-17.* W/Certificate of Svc ML20112D8721996-05-29029 May 1996 Intervenor Brief in Support of Commission Affirmation of LBP-95-17.* Commission Should Affirm Licensing Board Decision.W/Certificate of Svc ML20108D9571996-05-0303 May 1996 CEI Response to City of Cleveland 2.206 Petition.Nrc Should Deny Petition ML20108B7571996-04-26026 April 1996 Licensee Brief on Review of Licensing Board Decision LBP-95-17.* Recommends That Commission Reverse Board Memorandum & Order Issued 951004.W/Certificate of Svc & Svc List PY-CEI-NRR-2034, Comment Opposing Proposed Rule 10CFR20 Re Reporting Requirements for Unauthorized Use of Licensed Radioactive Matl1996-03-11011 March 1996 Comment Opposing Proposed Rule 10CFR20 Re Reporting Requirements for Unauthorized Use of Licensed Radioactive Matl ML20097B8721996-01-23023 January 1996 Petition of City of Cleveland,Oh for Expedited Issuance of Nov,Enforcement of License Conditions & Imposition of Appropriate Fines,Per 10CFR2.201,2.202,2.205 & 2.206 ML20097B8911996-01-23023 January 1996 Motion of City of Cleveland,Oh for Partial Summary Judgement or in Alternative,For Severance of Issue & Expedited Hearing Procedures ML20101B5841996-01-23023 January 1996 Motion of City of Cleveland,Oh for Partial Summary Judgement Or,In Alternative,For Severance of Issue & Expedited Hearing Procedures.W/Certificate of Svc ML20096E2471996-01-0303 January 1996 Comment on PRM 50-64 Re Stockpiling Ki for Use as Thyroid Protectant in Event of Nuclear Accident.Supports Distribution of Ki to Public ML20094N1951995-11-17017 November 1995 Oh Edison Application for License Transfer in Connection W/ Sale & Related Transactions ML20094M5941995-11-15015 November 1995 Intervenors Answer to Licensees Petition for Review.* Intervenor Conclude That Commission Should Not Review Board Decision.W/Certificate of Svc ML20094J9141995-11-0707 November 1995 Petition for Review.* Submits That Commission Review of Board Decision Appropriate Under 10CFR2.786. W/Certificate of Svc & Svc List ML20093N9491995-10-23023 October 1995 Licensee Request for Extension of Time to File Petition for Review.* Requests That Commission Grant Extension Until 951107 of Deadline for Filing Petition for Review. W/Certificate of Svc ML20065L3571994-04-0505 April 1994 Intervenors Answer to NRC Staff Response to Intervenors Motion for Summary Disposition & Licensees Cross Motion for Summary Disposition.* Urges Board to Deny Licensee Cross Motion.W/Certificate of Svc ML20064N9201994-03-21021 March 1994 Affidavit of RW Schrauder in Support of Licensee Cross Motion for Summary Disposition & Answer to Ohio Citizens for Responsible Energy,Inc & SL Hiatt Motion for Summary Disposition. W/Svc List ML20064N6341994-03-21021 March 1994 Affidavit of RW Schrauder in Support of Licensee Cross Motion for Summary Disposition & Answer to Ohio Citizens for Responsible Energy,Inc & SL Hiatt Motion for Summary Disposition.W/Certificate of Svc ML20064N6081994-03-21021 March 1994 Licensee Cross Motion for Summary Disposition & Answer to Ohio Citizens for Responsible Energy,Inc & SL Hiatt Motion for Summary Disposition.* Moves for Decision in Licensee Favor on Ocre Contention ML20063L4621994-02-0707 February 1994 Motion for Summary Disposition.* Intervenors Request That Board Grant Summary Disposition Favorably & Issue Declaratory Relief by Finding Challenged Portion of Amend 45 to Be in Violation of Aea.W/Certificate of Svc ML20058P4451993-12-13013 December 1993 Licensee Answer to Ohio Citizens for Responsible Energy,Inc & SL Hiatt Supplemental Petition for Leave to Intervene.* W/Certificate of Svc ML20059L9391993-11-12012 November 1993 Petitioners Supplemental Petition for Leave to Intervene.* Court Held That NRC May Not Eliminate Public Participation on Matl Issue in Interest of Making Process More Efficient. W/Certificate of Svc ML20059B1421993-10-19019 October 1993 Order.* Petitioners Shall File Supplemental Petition in Accordance W/Schedule in 931018 Order.W/Certificate of Svc. Served on 931020 ML20059B1761993-10-18018 October 1993 Order.* Informs That for Each Contention,Petitioners Shall Comply Fully W/Requirements of 10CFR2.714(b)(2)(i),(ii) & (III) & Their Filing Should Address Requirements Set Forth in Regulations.W/Certificate of Svc.Served on 931019 ML20059B0701993-10-12012 October 1993 Motion to Defer Consideration of Remanded Issue.* Requests That Licensing Board Defer Consideration of Remanded Issue Pending Outcome of Commission Review of 2.206 Process.W/ Certificate of Svc ML20058M8761993-09-30030 September 1993 Memorandum & Order CLI-93-21.* Appeal for Hearing Re Amend to Plant OL Denied.W/Certificate of Svc.Served on 930930 ML20057C0461993-09-21021 September 1993 Supplemental Director'S Decision DD-93-15 Involving 920929 Request for Certain Actions to Be Taken Re Proposed Construction of Interim onsite,low-level Radioactive Waste Facility at Plant.Request Denied ML20056C8951993-07-19019 July 1993 Order Extending Time within Which Commission May Rule on Petitions for Review of LBP-92-32.W/Certificate of Svc. Served on 930720 ML20045B5661993-06-0707 June 1993 Comment Re Proposed Generic Communication on Mod of TS Administrative Control Requirements for Emergency & Security Plans,As Published in Fr on 930401 (58FR17293).Believes Concept of Technical Review Not Addressed by STS ML20044E2781993-05-13013 May 1993 Comment Supporting Petition for Rulemaking PRM-50-58 Re VEPCO Petition to Change Frequency of Emergency Planning Exercise from Annual to Biennial ML20127A6171993-01-0606 January 1993 Order.* Time within Which Commission May Rule on Petitions for Review of Board Order LBP-92-32,dtd 921118,extended Until 930208.W/Certificate of Svc.Served on 930106 ML20126D5171992-12-23023 December 1992 City of Brook Park Answer to Petitions for Review.* Opposes Applicants 921208 Petitions for Review Based on Fact That ASLB Decision in proceeding,LBP-92-32,adequately Addressed Issues Raised in Petitions.W/Certificate of Svc ML20126F6501992-12-23023 December 1992 Answer of City of Cleveland,Oh,Intervenor,In Opposition to Petitions for Review of 921118 Decision of Aslb.* Petitioners Petitions for Review Should Be Denied. Certificate of Svc Encl ML20126D5801992-12-23023 December 1992 NRC Staff Answer in Response to Petitions for Review Filed by Oh Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & City of Cleveland.* W/Certificate of Svc ML20126D5781992-12-23023 December 1992 Answer of American Municipal Power-OH,Inc in Opposition to Petitions for Review of Oh Edison Co & Cleveland Electric Illuminating Co/Toledo Edison Co.* W/Certificate of Svc ML20126D5461992-12-23023 December 1992 Answer of Cleveland Electric Illuminating Co & Toledo Edison Co to Limited Petition for Review of City of Cleveland,Oh of 921118 Decision of Aslb.* Commission Should Deny City of Cleveland Petition.W/Certificate of Svc 1999-09-30
[Table view] Category:PLEADINGS
MONTHYEARML20198D9711998-11-0909 November 1998 Petition Per 10CFR2.206 Requesting That Facility Be Immediately Shut Down & OL Be Suspended or Modified Until Such Time That Facility Design & Licensing Bases Properly Updated to Permit Operation with Failed Fuel Assemblies ML20112J8281996-06-18018 June 1996 Licensee Reply Brief on Review of Licensing Board Decision LBP-95-17.* W/Certificate of Svc ML20112D8721996-05-29029 May 1996 Intervenor Brief in Support of Commission Affirmation of LBP-95-17.* Commission Should Affirm Licensing Board Decision.W/Certificate of Svc ML20101B5841996-01-23023 January 1996 Motion of City of Cleveland,Oh for Partial Summary Judgement Or,In Alternative,For Severance of Issue & Expedited Hearing Procedures.W/Certificate of Svc ML20097B8721996-01-23023 January 1996 Petition of City of Cleveland,Oh for Expedited Issuance of Nov,Enforcement of License Conditions & Imposition of Appropriate Fines,Per 10CFR2.201,2.202,2.205 & 2.206 ML20094M5941995-11-15015 November 1995 Intervenors Answer to Licensees Petition for Review.* Intervenor Conclude That Commission Should Not Review Board Decision.W/Certificate of Svc ML20094J9141995-11-0707 November 1995 Petition for Review.* Submits That Commission Review of Board Decision Appropriate Under 10CFR2.786. W/Certificate of Svc & Svc List ML20093N9491995-10-23023 October 1995 Licensee Request for Extension of Time to File Petition for Review.* Requests That Commission Grant Extension Until 951107 of Deadline for Filing Petition for Review. W/Certificate of Svc ML20065L3571994-04-0505 April 1994 Intervenors Answer to NRC Staff Response to Intervenors Motion for Summary Disposition & Licensees Cross Motion for Summary Disposition.* Urges Board to Deny Licensee Cross Motion.W/Certificate of Svc ML20064N6081994-03-21021 March 1994 Licensee Cross Motion for Summary Disposition & Answer to Ohio Citizens for Responsible Energy,Inc & SL Hiatt Motion for Summary Disposition.* Moves for Decision in Licensee Favor on Ocre Contention ML20063L4621994-02-0707 February 1994 Motion for Summary Disposition.* Intervenors Request That Board Grant Summary Disposition Favorably & Issue Declaratory Relief by Finding Challenged Portion of Amend 45 to Be in Violation of Aea.W/Certificate of Svc ML20058P4451993-12-13013 December 1993 Licensee Answer to Ohio Citizens for Responsible Energy,Inc & SL Hiatt Supplemental Petition for Leave to Intervene.* W/Certificate of Svc ML20059B0701993-10-12012 October 1993 Motion to Defer Consideration of Remanded Issue.* Requests That Licensing Board Defer Consideration of Remanded Issue Pending Outcome of Commission Review of 2.206 Process.W/ Certificate of Svc ML20126F6501992-12-23023 December 1992 Answer of City of Cleveland,Oh,Intervenor,In Opposition to Petitions for Review of 921118 Decision of Aslb.* Petitioners Petitions for Review Should Be Denied. Certificate of Svc Encl ML20126D5801992-12-23023 December 1992 NRC Staff Answer in Response to Petitions for Review Filed by Oh Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & City of Cleveland.* W/Certificate of Svc ML20126D5781992-12-23023 December 1992 Answer of American Municipal Power-OH,Inc in Opposition to Petitions for Review of Oh Edison Co & Cleveland Electric Illuminating Co/Toledo Edison Co.* W/Certificate of Svc ML20126D5461992-12-23023 December 1992 Answer of Cleveland Electric Illuminating Co & Toledo Edison Co to Limited Petition for Review of City of Cleveland,Oh of 921118 Decision of Aslb.* Commission Should Deny City of Cleveland Petition.W/Certificate of Svc ML20126D5171992-12-23023 December 1992 City of Brook Park Answer to Petitions for Review.* Opposes Applicants 921208 Petitions for Review Based on Fact That ASLB Decision in proceeding,LBP-92-32,adequately Addressed Issues Raised in Petitions.W/Certificate of Svc ML20126D4761992-12-22022 December 1992 Alabama Electric Cooperative Answer to Applicants Petitions for Review.* Applicants 921208 Petitions for Review Should Be Denied.W/Certificate of Svc ML20126A5751992-12-0808 December 1992 Petition for Review.* Requests That NRC Review LBP-92-32, 921118 Board Decision in Proceeding.Board Erroneously Interpreted Section 105(c) of AEA by Ignoring Fundamental Underpinning of Statute.W/Certificate of Svc ML20126A5871992-12-0808 December 1992 Petition for Review.* Requests That NRC Review ASLB 921118 decision,LBP-92-32.Board Erroneously Interpreted Section 105(c) of AEA by Ignoring Fundamental Underplanning of Statute.Certificate of Svc Encl ML20126A7651992-11-18018 November 1992 Limited Petition for Review of City of Cleveland,Oh of 921118 Decision of Aslb.* City of Cleveland Petition for Review Should Be Granted.W/Certificate of Svc ML20116M4671992-11-16016 November 1992 Licensee Response to Lake County Commissioners 10CFR2.206 Petition.* Petition Should Be Denied.Certificate of Svc Encl ML20116E7941992-09-29029 September 1992 Petition for Action to Relieve Undue Risk Posed by Const of Low Level Radwaste at Perry Plant.* Requests Public Hearing Be Held Prior to Const of Storage Site & Const Should Be Suspended Until NRC or Util Produces EIS on Risks ML20101N5131992-07-0808 July 1992 City of Cleveland Opposition to Applicant Request That Licensing Board Disregard Certain Arguments of City of Cleveland Counsel in Oral Argument.Certificate of Svc & Svc List Encl ML20101N6401992-07-0707 July 1992 Reply by American Municipal Power-Ohio,Inc to Applicant Request That Board Disregard Factual Issues.* Applicant Requests Board Disregard Irrelevant Assertions by All Parties.W/Certificate of Svc ML20101K2101992-06-29029 June 1992 Applicants Request That Licensing Board Disregard Factual Issues Discussed During Oral Argument.* Foregoing Issues Represent Factual Issues Which Board Should Disregard in Disposition of Phase One of Case.W/Certificate of Svc ML20098D5181992-05-26026 May 1992 Reply of City of Cleveland,Oh to Arguments of Applicants & NRC Staff W/Respect to Issues of Law of Case,Res Judicata, Collateral Estoppel & Laches.* W/Certificate of Svc & Svc List ML20096A6281992-05-0707 May 1992 Applicants Reply to Opposition cross-motions for Summary Disposition & Responses to Applicants Motion for Summary Disposition.* Applicants Conclude NRC Has No Authority to Retain Antitrust Licensing Conditions.W/Certificate of Svc ML20090F4261992-03-31031 March 1992 Motion for Summary Disposition of Intervenor,City of Cleveland,Oh & Answer in Opposition to Applicant Motion for Summary Disposition.* City of Cleveland,Oh & Applicant Motions Should Be Denied.W/Certificate of Svc ML20094K3791992-03-18018 March 1992 Applicants Motion to Amend Summary Disposition Schedule.* Applicants Request That Motion to Amend Summary Disposition Schedule Be Granted.W/Certificate of Svc ML20094J2891992-03-0909 March 1992 Response of DOJ to Applicant Motion for Summary Disposition.* Urges ASLB to Resolve Bedrock Legal Issue in Negative & Concludes That Commission Possess Legal Authority to Retain License Conditions.W/Certificate of Svc ML20091N1241992-01-24024 January 1992 Applicants Answer to Cleveland Motion to Amend Schedule for Summary Disposition Motions.* Applicants Have No Objection to Request for Opportunity to Submit Reply.W/Certificate of Svc ML20087E7821992-01-16016 January 1992 Motion to Amend Schedule for Summary Disposition Motions.* Cleveland Requests That Motion Be Granted & 911114 Order Establishing Schedule for Motions for Summary Disposition Be Amended.W/Certificate of Svc & Svc List ML20086U5371992-01-0606 January 1992 Applicants Motion for Summary Disposition.* Requests That Board Grant Applicants Motion for Summary Disposition Due to Lack of NRC Authority to Retain Antitrust License Conditions.W/Certificate of Svc ML20086J4821991-12-31031 December 1991 Reply Brief of City of Cleveland,Oh in Support of Notice of Appeal of Prehearing Conference Order Granting Request for Hearing.* Appeal Should Be Granted,Ref to Board Revoked & Applications Dismissed.W/Certificate of Svc ML20086Q9231991-12-27027 December 1991 Motion of City of Cleveland,Oh for Leave to File Reply & Reply to Applicants Answer to City Motion for Commission Revocation of Referral to ASLB & for Adoption of 910424 Decision as Commission Decision.W/Certificate of Svc ML20086Q3001991-12-24024 December 1991 Applicant Answer to Motion of City of Cleveland,Oh for Commission Revocation of Referral to ASLB & for Adoption of 910424 Decision as Commission Decision. * W/Certificate of Svc ML20091H7161991-12-19019 December 1991 Motion of City of Cleveland,Oh for Commission Revocation of Referral to ASLB & for Adoption of 910424 Decision as Commission Decision.W/Certificate of Svc ML20086N4601991-12-17017 December 1991 Licensees Response to Ohio Citizens for Responsible Energy, Inc & SL Hiatt Amended Petition for Leave to Intervene.* Determines That Intervenor Failed to Demonstrate Interest in Proceeding.W/Certificate of Svc & Svc List ML20086J4741991-12-0909 December 1991 Motion of City of Cleveland,Oh for Leave to File Reply Brief.* Motion to File Reply Should Be Granted for Listed Reasons ML20086G4001991-11-26026 November 1991 Ohio Edison Co Motion for Reconsideration.* Util Respectfully Requests That NRC Vacate CLI-91-15 & Direct Forthwith Answer to Licensee Motion to Compel.W/Certificate of Svc ML20079Q0301991-11-0606 November 1991 Oec Motion to Compel NRC Staff to Respond to Interrogatories.* Util Moves Board to Compel NRC to Respond Completely,Explicitly & Properly to Licensee Interrogatories.W/Certificate of Svc ML20083B5841991-09-0606 September 1991 Licensee Answer to Oh Citizens for Responsible Energy,Inc & SL Hiatt Petition for Leave to Intervene & Request for Hearing.* Ocre Has Shown No Interest in Proceeding.W/Notice of Appearance,Certificate of Svc & Svc List ML20076D1611991-07-18018 July 1991 Answer of Ohio Edison Co to Petition of American Municipal Power-Ohio,Inc (AMP-Ohio) for Leave to Intervene.* Util Does Not Object to Admission of AMP-Ohio as Intervenor on Basis of Status as Beneficiary.W/Certificate of Svc ML20076D0481991-07-18018 July 1991 Answer of Cleveland Electric & Toledo Edison to Petition of American Municipal Power-Ohio for Leave to Intervene.* Utils Believe That 910703 Petition Should Be Granted.W/Certificate of Svc ML20081K8961991-06-20020 June 1991 Alabama Electric Cooperative Reply to Oppositions Filed to Petition to Intervene.* Informs of Util Intention to Assure Vindication of Proper Legal Principle.W/Certificate of Svc ML20079D2391991-06-17017 June 1991 Answer of Cleveland Electric Illuminating Co & Toledo Edison Co to Opposition of City of Cleveland,Ohio,To Hearing W/Respect to Denial of Applications to Suspend Antitrust License Conditions & Petition to Intervene.* ML20079D2211991-06-17017 June 1991 Answer of Ohio Edison Co to Opposition of City of Cleveland, Oh to Hearing W/Respect to Denial of Applications to Suspend Antitrust License Conditions & Petition to Intervene in Event Hearing Requested & Granted.W/Certificate of Svc ML20079D2151991-06-14014 June 1991 Answer of Ohio Edison Co to Petition of Alabama Electric Cooperative,Inc for Leave to Intervene.* Alabama Electric Cooperative,Inc Petition for Leave to Interveve Should Be Denied.W/Certificate of Svc 1998-11-09
[Table view] |
Text
4
,/
&T UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION '82 '"J -7 pn gn Before the Atomic Safety and Licensing Board I'J -
.[
In the Matter of )
) %
CLEVELAND ELECTRIC ILLUMINATING ) Docket Note.)5D7 .'
COMPANY, ej al. ) /N ' ' _
4
) 6 (OL)
(Perry Nuclear Power Plant, ) < s Units 1 and 2) ) f i g d,3 g e:P -ggy -
L, o i MOTION FOR LEAVE TO SUBMIT ADDITIONAL . CONTENTIONS f
9 [fy m "
Intervenor Sunflower Alliance et al. hereby moves the Licensing Board to grant it leave to amend its Petition for Leave to Intervene by submitting the two additional contentiens detailed below. These contentions are based on the Draft Environmental Statement for Perry, NUREG-0884, which was just issued in late March; therein lies the good cause for this late filing.
Psychological Stress On January 7, 1982 the U.S. Court .of. Appeals ruled that the NRC must conduct an environmental assessment, under the ,
National Environmental Policy Act (NEPA), of the psychological effects on residents living near the Three Mile Island nuclear ,
plant before Unit 1 of that facility may be allowed to restart (People Against Nuclear Energy (PANE) v NRC, exact citation unknown). Although the TMI-l restart case involved the special circumstances of restarting the undamaged reactor on the same site of the worst commercial nuclear accident in history, this g O$fo$$@yQ0 PDR ghI
s -g-decision is presumably applicable to all nuclear plant sites, since the same potential for catastrophic accidents exists at all nuclear facilities. With the widespread publicity the TMI-2 accident received, most people are aware of this accident potent $al, and thus living in close proximity to a nuclear reactor may well cauce stress. Indeed, the mere prospect of being forced to leave one's home at a moment's notice in an evacuation, the lack of adequate property insurance (under the Prica-Anderson Act) to cover any damage caused by a nuclear accident, and concerns regarding the effects of low-level radiation effluents emitted during normal plant operation are all grounds for anxiety around any nuclear facility.
Considerations of the health effects of nuclear plant operation, under both NEPA and the Atomic Energy Act, have traditionally been limited to physiological effects. However, the medical consensus today is that mental and physical health are closely allied. The deleterious effects of psychological stress on physical health are well known. These facts alone would mandate the study of the psychological effects of nuclear plant operation on the public. This recent court decision gives legal sanction to these medical concerns by explicitly declaring psychological effects to be under the scope of NEPA.
This court decision addressed one of the fundamental questions of the modern er.a: the tensions between man's technological ability to create ever more complicated and dangerous devices, presumably for his own welfare, and the impact on his psychological health and his fundamental sense of harmony with the environment if those devices should fail
and pose a potentially unthinkable threat of widespread dis-aster. The actual threat itself is a separate matter. As such, this case sets precedent for all NRC licensing actions; indeed, it may have ramifications extending far beyond the nuclear power industry. This proceeding should thus be bound by the court's decision.
An examination of the DES for Perry indicates that psycho-logical stress effects have not even been mentioned, let alone evaluated.
Both the Atomic Energy Act and NEPA require the NRC to consider the psychological effects of nuclear plant operation on the local community surrounding such facilities. This recent court decision affirms this. The NRC must comply with the law and prepare an evaluation of the psychological effects of plant operation on residents living near the Perry plant.
This evaluation must be performed, and its results incorporated into the cost-benefit analysis required by NEPA, before Perry can be licensed to operate. ,
Local Economic Effects in the Cost-Benefit Analysis Sunflower Alliance et al. contends that the cost-benefit analysis in the Perry DES is skewed to favor operation of Perry due to the improper inclusion of increased employment and tax revenues to the local community as benefits.
Table 6.1, entitled " Benefit-Cost Summary," pp. 6-2 and 6-3 of the DES lists as " indirect benefits" local taxes of
$22 million/ year, annual employment of 399 persons, and arinual payroll of $10 million. The NRC Staff has assessed these " ben-crits" to be "large" ( taxes ) and "modercte" (employment and
e payroll).
The Atomic Safety and Licensing Appeal Board has ruled that increased employment and tax revenues to the affected community may not be counted on the benefit side of the cost-benefit balance (Public Service Company of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-471, 7 Nhc 477, 479 (1978)).
Sunflower Alliance et al. therefore contends that the NRC Staff has not complied with the law in preparing the DES. The cost-benefit analysis should be redone, this time in conformance with ALAB-471, before Perry can be licensed to operate.
Requirements for Late filing Under 10 CPR 2.714 Sunflower Alliance et al. has met the require =ents for late-filed contentions under 10 CFR 2.714. Both cf these contentions are based on the recently issued Perry DES; in addition, the psychological stress contention is based on a recent court ruling. These factors constitute abundant good cause for late filing. Sunflower Alliance has only this pro-ceeding in which to protect its interests; the issues considered herein are specific to the Perry facility, and therefore cannot be properly resolved by any other means. Sunflower in addition knows of no other party that is raising these issues. The inclusion of these contentions will certainly aid in the develop-ment of a sound record. Although the issues will be somewhat croadened by the admission of these contentions, the amount of delay, if any, caused thereby is unknown. The abcve factors clearly favor the admission of these two contenticns into this
Proceeding, and Sunflower Alliance et al. prays that the Boc"d is so moved.
[0A v L iel D. Wilt, Esq.
A torney for Sunflower Alliance Inc., et al 7301 Chippewa Rd.
Breeksville, Ohio 44141 (216) 526-2350 4
11 allee A copy of this Motion has been sent to all persons on the Service List byk First Class, United States Mail, on this 5th daf< of May,1982.
fiA /A D nfe l' D. Wilt /, Esq.
Attorney for Sunflower Alliance Inc., et al f
9