ML20052D671
| ML20052D671 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/22/1982 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML20052D672 | List: |
| References | |
| TAC-43263, NUDOCS 8205070074 | |
| Download: ML20052D671 (2) | |
Text
APA 2 ; 136 DISTRIBUTION:
DEisenhut Docket File SMiner NRC DR Ringran ps,jq O#
O Ef4 Rd9 H0 rns tei n incket No. 50-E2 EBlackwod OELD AEOD Mr. John A. Hancock Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing P. O. Box 14042, M. A.C. %2 St. Petersburg, Florida 33733
Dear Mr. Hancock:
SuSJECT: CRVSTAL RIVER UNIT 3 - INDUCED ERRORS 19 THE riEllTRX F1l')
DETECTOR READ!!!GS We have mytowed your March 20, 1981 msponse to our January 14, il 1 letter regarding event induced ermrs in the neutron flux detecton that could cause higher flux trip levels than those asstret in th-analysis of some events.
From our review, we have concluded that fbr operating BW reactor plants the limits on Die and center fuel melt are not excee<1ed because of these ermrs and no changes are required for present operating para-notars. Our Safety Evaluation Report (SER) is enclosed.
[
Sincerely,
~~
.a
\\i N.ut?. m w John F. Stolz, Chief Operating Reactors Dranch v'd Division of Licensing i
Enclosure:
SER Ce ts/ enclosure:
L see next page r
i 9205070074 820422 PDR ADOCK 05000302 9
~'
~
. y.. '.:h.
015 C-02 f 4:DL
.j o*ea p
' own.ame 6
.i.
W.
4
...h........
m.,. p as 'oam>H+4 mean se __. __
OEDCIAL R E CO R D COPY ___...
Crystal River Unit No. 3 Florida Power Corporation cc w/ enclosure (s):
fir. S. A. Brandisere Florida Power Corporation Mr. Robert B. Bor ur Vice President and General Counsel Babcock & Wilcox P. O. Box 14042 Nuclear Power Genera t me. m.
St. Petersburg, Florida 33733 Suite 220. 7910 Woodcur,t Aw. :
Bethesda. Maryland 203i4 Mr. Wilbur Langely, Chairman Board of County Cosnissioners Mr. Ton Stetka. Resident Ir,mector C1trus County U.5. Nuclear Requiatory Corri 3 i or:
Iverness, Florida 36250 Route #3, Box 717 Crystal River, Florida 3 2 6."-
Regional Radiation Representative Mr. T. C. Lutkehaus EPA Region IV Nuclear Plant Manager 345 Courtland Street, M.E.
Florida Power Corporation Atlanta, Georgia 30308 P. O. Box 219 Crystal River, Florida 32629 Bureau of Intergovernmental Relations 660 Apalachee Parkwe.y Crystal River F211c Library Tallahassee, Florida 3230a 668 N. W. First Avenue Crystal River, Florida 32629 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Attorney Generai Department of Legal Affairs j
l The Capitol Tallahassee, Floride 32304 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Rtgion II 101 Marietta Street.. Suite 3100 Atlanta, Georgia 30303
- w,, %,._ n 4 O