Text
.
.
APR 2 2 hf2
x@y .
Docket No. 50-255(DETI)
/ 93
/x
Consumers Power Company
-
CJ
,
ATTN:
Mr. R. B. DeWitt
l7 '
/
Vice President
,'~g-
g
_,
Nuclear Operations
'
,
m
"!][i
212 West Michigan Avenue
C
-
kq
Jackson, MI 49201
'-
xA
Gentlemen:
(
This refers to the special safety inspection conducted by Mr. J. F. Norton
of this office on April 6,1982, of activities at Palisades Nuclear
Generating Plant authorized by NRC Operating License No. DPR-20 and to
the discussion of our findings with Mr. R. W. Montross and others at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
,
'
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
t
!
!
<
8205060400 820422
l
PDR ADOCK 05000
74
'
//
.
Consumers Power Company
2
APR 2 2 M2
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" drIZI 7T 26 [r,. cf, pg g,p
0
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosure:
Inspection Report
No. 50-255/82-09(DETI)
cc w/ encl:
D. J. VandeWalle, Nuclear
Licensing Administrator
R. W. Montross, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
',
'
R
RIII
RI
I
I
Norto 'jp
Williams
Boyd
Li tle
Norelius
/
4/21/82
,
l