Proposed Tech Spec Table 15.3.5-1 Re Time Delay Settings on Protective Relays
ML20052C549
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/27/1982
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20052C544 List:
References
NUDOCS 8205050136
Download: ML20052C549 (1)


Text

.

s 1933 '

OM 2hl TABLE 15.3.5-1 (Continued) 70 (Page 2 of 2)

E.

M-O Ff O

u7 NO. FUNCTIONAL UNIT CIIANNEL SETTING LIMIT OM 00 3M 9. Degraded Voltage (4.16 KV) Disconnection of affected bus from offsite power

> 3762 volts +2%

Time delay: ,less than 30 sec ggs4 at 0-100% of voltage setting **

10. Loss of Voltage
a. 4.16 KV Disconnection of affected a. 2450 volts +3%

bus from offsite power Time delays , <0.4 sec. +104 Start Diesel at 0 volts 11.2 sec. +20% at 90% of voltage setting

b. 480 V Load shedding b. 256 volts +3%

Time delay: <0.75 sec. +10s at 0 volts 13.5 sec. +20 at 90% of i voltage setting

    • Within 6 months of the effective date of this amendment (January 11, 1982) the licensee will submit further justification for this voltage setpoint and time delay or a proposed Technical Specification change for Units 1 and 2. The January 11, 1982 effective date is for Unit 1 only. For Unit 2 this limit is effective upon installation' of the associated relays but in no case la'ter than upon return to power from the spring 1982 refueling outage.