Requests Addl Info within 30 Days Re 810608 Application Concerning Deletion of Position of Chief Operating Engineer
ML20052C451
Person / Time
Site: Pilgrim
Issue date: 04/27/1982
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Morisi A
BOSTON EDISON CO.
References
NUDOCS 8205050001
Download: ML20052C451 (2)


Text

r l

t gp g 3 y T3 d

~~

Distribution:

Docket File K. Eccleston NRC PDR S. Norris Local PDR NSIC Docket No. 50-293 ORB #2 Reading ACRS-10 D. Eisenhut J. Heltems OElb Gray IE:1 LQB r

' c3 Mr. A. Victor Morisi, Manager DHFS Nuclear Operations Support Department Boston Edison Company RECEIVEQ M/C Nuclear

. APR 271982> it 800 Boylston Street sam m ymm Boston, MA 02199 seum,

a

Dear Mr. Ibrist:

s Re: Pilgrim Nuclear Power Station We are continuing our review of your application dated June 8,1981 concerning the deletion of the position of Chief Operating Engineer and have identified the need for additional infomation.

Your June 8,1981 a'pplication proposed the deletion of the position of Chief Operating Engineer (COE) resulting in the Watch Engineers (Shift Supervisors) reporting directly to the Deputy Nuclear Operations Manager.

In conjunction with this change the position of Day Watch Engineer has been established.

It is your 6.P.ed intent to rotate selected Watch Engineers on an approximate six-month frequency. The functions of the Day Watch Engineer appear to include many of those that would nomally be associated with the position of COE (ANSI-N.18.1 Operations Manager).

In order for us to complete our review of your application, please provide the following infomation within 30 days of the date of this letter:

1.

Define the Deputy Manager and the qualifications of the Deputy Manager who is responsible for directing the operation of the facility, including the Watch Engineers.

2.

Define the responsibilities of this Deputy Manager.

Until we obtain this infomation and your demonstration that clear lines of authority have been established and that unambiguous responsibility for operation of Pilgrim has bben assigned to a qualified individual, we cannot conclude that this proposed change is acceptable.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respordents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, 8205050001 820427 Flginal Signed by PDR ADOCK 05000293 P

FDR Domenic B. Vassallo, Chief a#

ORB Operating Re tctors Branch #2 ORB #2 ORBf2

.... 2.w#2 Div4sion"ef" Atenstng ""

omer)

~ ~ " " " " " " "

SNorris KEccleston: be DVassallo

~4Q78E"""p""""f/Jf/55"'

sunmuc h

..,ee:.... S ee "ne ct" p age"""""" *" U E y B2'" '

'"""""~""""

' " " " " " " " " " ~

onet

- ~ " -

... - -.. - ~ ~ ~

. NRC FORM 318 (10 80) NRCM 024o OFFICIAL RECORD COPY usa m m m eeo

,m

.o Mr. A. Victor Morisi Boston Edison Company i

i cc:

Mr. Richard D. Machon Pilgrim Station Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Henry Herrmann, Esquire Massachusetts Wildlife Federation 151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts 02360 Resident Inspector c/o U. S. NRC P. O. Box 867 Plymouth, Massachusetts 02360 Ms. JoAnn Shatwell Office of the Attorney General Environmental Protection Division 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Ronald C. Haynes Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue s,,,

King of Prussia, PA 19406

,