ML20052B992
| ML20052B992 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/11/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20052B984 | List: |
| References | |
| NUDOCS 8205040237 | |
| Download: ML20052B992 (2) | |
See also: IR 05000335/1982004
Text
__
.
_
_
f
c /[V
1 I IN
t
!
i
Florida Power and Light Company
i
ATTN: Dr. R. E. Uhrig, Vice President
(
Advanced Systems and Technology
l
P. O. Box 529100
'
Miami, FL 33152
'
Gentlemen:
,
Subject: Report NosC50-335/823 nd 50-389/82-03
J
This refers to the routine safety inspection conducted by Mr. S. A. Elrod of this
office on January 11 - February 12, 1982, of activities authorized by NRC
Operating License Nos. DPR-67 and Construction Permit No. CPPR-144 for the St.
Lucie facility. Our preliminary findings were discussed with Mr. C.11. Wethy,
Plant Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A..
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
,
820504o?S'l
.
. - - -
. = . -
.
-_ _
-
-.
.
,
.
.
..
NAR 1 1 El
~
Florida' Power & Light Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
(b5ll
,
F. J. Long, Acting Chief
Reactor Project Branch 2,
!
'
Division of Resident and
Reactor Project Inspection
Enclosures:
1
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-335/82-04
and 50-389/82-03
"
cc w/ encl:
>
'
C. H. Wethy, Plant thnager
N. Weems, As:1stant QA
Construction Manager
B. J. Escue, Plant Manager
>
bec w/ encl:
NRC Resident Inspector
Document 11anagement Branch
State of Florida
,
RII
RII
RII
RII
SElrod:dt
Klandis
HDance
FLong
3/ /82
3/ /82
3/ /82
3/ /82
i
.
, _ .
--
-
-..
-
._,
- , .