Forwards IE Insp Rept 50-335/82-04 on 820111-0212 & Notice of Violation
ML20052B992
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/11/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20052B984 List:
References
NUDOCS 8205040237
Download: ML20052B992 (2)


See also: IR 05000335/1982004

Text

__

.

_

_

f

c /[V

1 I IN

MAR

t

!

i

Florida Power and Light Company

i

ATTN: Dr. R. E. Uhrig, Vice President

(

Advanced Systems and Technology

l

P. O. Box 529100

'

Miami, FL 33152

'

Gentlemen:

,

Subject: Report NosC50-335/823 nd 50-389/82-03

J

This refers to the routine safety inspection conducted by Mr. S. A. Elrod of this

office on January 11 - February 12, 1982, of activities authorized by NRC

Operating License Nos. DPR-67 and Construction Permit No. CPPR-144 for the St.

Lucie facility. Our preliminary findings were discussed with Mr. C.11. Wethy,

Plant Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A..

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

,

820504o?S'l

.

. - - -

. = . -

.

-_ _

-

-.

.

,

.

.

..

NAR 1 1 El

~

Florida' Power & Light Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

(b5ll

,

F. J. Long, Acting Chief

Reactor Project Branch 2,

!

'

Division of Resident and

Reactor Project Inspection

Enclosures:

1

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-335/82-04

and 50-389/82-03

"

cc w/ encl:

>

'

C. H. Wethy, Plant thnager

N. Weems, As:1stant QA

Construction Manager

B. J. Escue, Plant Manager

>

bec w/ encl:

NRC Resident Inspector

Document 11anagement Branch

State of Florida

,

RII

RII

RII

RII

SElrod:dt

Klandis

HDance

FLong

3/ /82

3/ /82

3/ /82

3/ /82

i

.

, _ .

--

-

-..

-

._,

- , .