Forwards IE Insp Rept 50-416/82-23 on 820322-26.No Noncompliance Noted
ML20052B965
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/08/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20052B966 List:
References
NUDOCS 8205040204
Download: ML20052B965 (2)


See also: IR 05000416/1982023

Text

,

-

.

..

._.

.

_ _ _

~

' ~

.

4

.

% Ital

APR

8 1982

Mississippi Power and Light Company

ATTN:

Mr. N. L. Stampley

%

, cq , 43

$

Vice President of Production

d

f,@

P. 0 Box 1640

\\

p,

_ . _

Jackson, MS 39205

t>

'

'

-

97

rg $32' A

Gentlemen:

-

YM

cP

'

uvff 5 i f

H

j

Subject:

Report No. 50-416/82-23

9

M

/

This refers to the routine safety inspection condu #

H. Johnson of

this office on March 22-26, 1982, of activities author .g

y NRC Construction

Permit No. CPPR-118 for the Grand Gulf facility and to the discussion of our

findings held with Mr. C. K. McCoy, Pl. tnt Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

4

,

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

L

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document -Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation.to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

'

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

F. S. Cantrell, Acting Chief

Reactor Projects Branch 1

Division of Project and

7

Resident Programs

Enclosure:

See Page 2

R2050402o4

TEol y

~

.

s

.

2

'APR

8 1982

Enclosure:

Inspection Report No. 50-416/82-23

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

RII

RII

RI

RI

RII

%'itdfW

'/df4jfW

W

h

AHJohMson:ht

FJape

ARHerdt

R utcher

FSCantrell

%/7/82

y/ 7/82

N/1/82

// 7/82

3/ /82