ML20052B896

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/82-22 & 50-417/82-07 on 820323-26.No Noncompliance Noted
ML20052B896
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 04/09/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20052B897 List:
References
NUDOCS 8205040120
Download: ML20052B896 (2)


See also: IR 05000416/1982022

Text

{{#Wiki_filter:. _ . _. _ _ _ _ _ _ _ _ _ _ _ _ _

. . , . I ! APR 9 1982 ! @ l y - . [[ Mississippi Power and Light Company ATTN: Mr. N. L. Stampley } Vice President of Productior. f _ P. O. Box 1640 l- 7p 7 - f Jackson, MS 39205 y, i \\' N Gentlemen: ' ' G - ,p Subject: Report Nos[ 82-22]tnd 50-417/82-07 k.' /g , This refers to the routine safety inspection conducted by Mr. A. B. Ruff of this office on March 23-26, 1982, of activities authorized by NRC Construction Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility and to the discussion of our findings held with Mr. G. B. Rogers. Site Manager, at the conclusion of the inspection. Areas examined during the inspection and our findings are discusse.1 in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no violations or deviations were disclosed. l In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC's Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written appli- cation to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 10 CFR 2.790(b)(1). Should you have any questions concerning this letter, we will be glac to discuss them with you. Sincerely, 1 F. J. Long, Acting Chief Reactor Projects Branch 1 Division of Project and Resident Programs Enclosure: See Page 2 820504ogg _ - - - - - - - T Ecl )

(

. -. a Mississippi Power and Light Company 2 'APR 9 1982 Enclosure: Inspection Report Nos. 50-416/82-22 and 50-417/82-07 cc w/ encl: D. C. Gibbs, Vice President Middle South Energy, Inc. C. K. McCoy, Plant Manager bcc w/ encl: NRC Resident Inspector Document Management Branch State of Mississippi RII RII RI: RII RII 6 I 1 g[ /U 1

A Ruff:ht TCConlon ARherdt RBu3cher FJ L'ong /g/82 /g/82 %/q /82 /5 /82 p'//82 }}