_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
{
Docket Nos. 50-528/529/530 50.55(e) Report
>qt)
Q']'E0 d
IL) a.
f*LPthem3D23111WGLni (0D3 EPA..
W 2,,!!'
li W XV1 M N A P. O. DO x 216 6 0 PHOENIX. Am2ON A o5036 April 16, 1982 ANPP-20715-Gild /BSK U. S. Nuclear Regulatory Commission Region V
{.1%j$ j Creekside Oaks Office Park p
Nf3 1450 Maria Lane - Suite 210 Tg Walnut Creek, California 94596-5368 g
t..i Attention:
Mr. T. W. Bishop, Chief l,,,, a < p ;.s Reactor Construction and
'!I
~~
}
3 Engineering Support Branch g
C.
,c
~
?
e
Subject:
Interim Report - DER 82-9
\\Oh j
A 50.55(e) Potentially Reportable Deficiencyqld;1atpnp to Thermowells In Diesel Generator Lube 011 Sfstents by Cooper Energy Were Not Procured to ASME Code File:
82-019-026 D 4.33.2
Reference:
Telephone Conversation between T. Bishop and G. Duckworth on March 16, 1982
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by June 16, 1982, at which time a complete report will be submittet..
Very truly yo
{
O r
'l E-G LL th~1 R t E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:skc Attachment cc: See Attached Page 2 x
ibl3 I 8204300TG
,sm
U. S, Nuclegg g:gulatory Commission Attention:
Mr.
T. W. Bishop, Chief ANPP-20715-CHD/BSK April 16, 1982 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognini l
A. C. Rogers B. S. Kaplan W. E. Ide J. Gorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson
~
L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 i
f i
l l
I h*
e l
INTERIM REPORT - DER 82-9 POTENTIAL REPORTABLE DEICIENCY ARIZONA PUBLIC SERVI;J 8,OMPANY (APS)
PVNGS UNITS 1, 2 AND 3 I.
Potential Problem The Diesel Generator Specification 13-MM-018 requires certain piping assemblies to be ASME Section III, Class 3.
Contrary to this, stainless steel thermowells for RTD's and thermometers are not traceable to ASME Section III, Class 3, material, and are installed in Class 3 piping. The piping systems are low pressure (less than 100 psig) and low temperatures (less than 200F). The standard thermowells are rated in excess of 6,000 psig at 200F.
II.
Approach To and Status Of Proposed Resolution Nonconformance Reports MG-1190, 1191 and 1192 (Units 1, 2 and 3, respectively) have been initiated to replace all the standard thermowells with thermowells traceable to the ASME Section III Code.
III.
Projected Completion of Corrective Action and Submittal of the
~
Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by June 16, 1982.
i