ML20052B295
| ML20052B295 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 04/15/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20052B296 | List: |
| References | |
| NUDOCS 8204300265 | |
| Download: ML20052B295 (3) | |
See also: IR 05000254/1982007
Text
I
-.
_ - _ _ .
.
.
IAPH 1 o ed2
l~
~
Docket No. 50-254(DETP)
BECEIVED
$
Docket No. 50-265(DETP)
,
J
APR 291982w
-
Commonwealth Edison Company
g
s ama tt.ur emg Jy
ATI'N:
Mr. Cordell Reed
"h*38 88
Vice President
<
/
Post Office Box 767
Chicago, IL 60690
4
M
Gentlemen:
This refers to the closecut inspection conducted by Mr. M. M. Holzmer of
this office on March 11, 1982, of activities at Quad-Cities Nuclear Power
Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-29 and
No. DPR-30 and to the discussion of our findings with Mr. N. Kalivianakis
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of th?s letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
NcY
8204300 M
w
---
-_
Y'h
^
.
.
"O
Commonwealth Edison Company
2
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
SS N.
.g f
.
W. S. Little, Chief
Engineering Inspection Branch
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-254/82-07(DETP)
and No. 50-265/82-07(DETP)
cc w/encls:
Louis 0. De1 George, Director
of Nuclear Licensing
N. Kalivianakis, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Lg
RIly ,
RIII
RI
RII
o
t
[
Holzmer/so
S afer
Kn ?
L
ttle
4/9/82
/l- @-W
l
__ -