Fifth Interim Deficiency Rept Re Dimensionally Nonconforming Anchorage Matl,Initially Reported 810505.Util Awaiting Inryco Anchorage Measurements Before Finalizing Disposition of Deficiency.Next Rept 820816.Also Reported Per Part 21
ML20052A518
Person / Time
Site: Bellefonte  
Issue date: 04/13/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8204280417
Download: ML20052A518 (2)


Text

o J.

~

11 9

' ~ ?Il TENNESSEE VALLEY AUTHORITYy,n4"9

~

its'.

CH ATTANOOGA TENNESSEE 37401

^.

400 Chestnut Street Tower,$1I)pg ?2 p12 3 4 April 13, 11982 BLRD-50-438/81-33 y@

/ e,q, BLRD-50-439/81-36 g

Q 1

g

'ff-al 4

f.3 U.S. Nuclear Regulatory Commission 1.1 Region II

-j

, O,,@ ?

~2 Attn:

Mr. James P. O'Reilly, Regional Administrator

,./jffi.

101 Marietta Street, Suite 3100

'n py q

Atlanta, Georgia 30303

'q,

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - DIMENSIONALLY NONCONFORMING ANCHORAGE MATERIAL - BLRD-50-438/81-33, BLRD-50-439/81 FIFTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Celenjak on May 5, 1981 in accordance with 10 CFR 50.55(e) as NCR's 1447 and 1457. This was followed by our interim reports dated June 5, August 19, and November 12, 1981 and February 2, 1982. Enclosed is our fifth interim report. We expect to submit our next report by August 16, 1982. TVA considers 10 CFR Part 21 to be applicable to this deficiency.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L.M. Mills,knager Nuclear Regulation and Safety Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure) l Office of Inspection and Enforcement U.S. Nuclear Regulatory Co:nmission Washington, DC 20555

' ghi

?

82042809 q T.5, W7

/ /

An Equal Opportunity Employer

\\

s ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 DIMENSIONALLY NONCONFORMING ANCHORAGE MATERIAL NCR'S 1447 AND 1457 BLRD-50-438/81-33, BLRD-50-439/81-36 10 CFR 50.55(e)

FIFTH INTERIM REPORT Description of Deficiency INRYCO, Incorporated, is the contractor, contract No. 75C53-85380, for supplying and installing the prestressing system for the primary containments at Bellefonte Nuclear Plant units 1 and 2.

On April 15, 1981, INRYC0 informed TVA that a shophead/ bushing failure had occurred during stressing operations on March 19, 1981 at the Braidwood Nuclear Plant and that INRYC0 had submitted a report in accordance with 10 CFR Part 21 to the Nuclear Regulatory Commission to document this failure. As a result of this failure, INRYC0 began measuring the unstressed anchorage material at Bellefonte. Several cases have been documented whereby the dimensions measured do not fall within the tolerances established by the shop fabrication manual. In some instances, the anchorage material is oversized and in other instances, the anchorage material is undersized.

Interim Progress TVA is awaiting Inryco's submittal of all anchorage measurements before finalizing a disposition of this deficiency. All anchorages are measured, and Inryco is preparing to transmit these measurements to TVA.

All NCR's concerning dimensionally nonconforming anchorage material will be hanaled under this report (BLRD-50-438/81-33, -439/81-36). To date these include 1447, 1457, 1461, 1469, 1473, 1474, 1475, 1485, 1491, 1502, 1510, 1511, 1521, 1523, 1542, 1547, 1558, 1562, 1571, 1590, 1591, 1628, 1629, 1630, 1642, 1643, 1650, 1657, 1670, 1678, 1698, 1704, 1712, and 1724.