| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 05/07/1982 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20049A609 | List: |
| References | |
| LSO5-82-05-004, LSO5-82-5-4, NUDOCS 8205140538 | |
| Download: ML20051C452 (3) | |
Text
Sx G
/
DISTRIBUTION Docket May 7,1992 NRC POR I Q, local PDR
[
4 C
Docket No. 50-213 c
LS05-82-05-004 f,2 tchfield H
(2) g Mr. W. G. Counsil. Vice President (2)
Nuclear Engineering and Operations s (10) 4 Connecticut Yankee Atomic Power Company iggs Post Office Box 270 W
TBarnhart (4)
Hartford, Connecticut 06101 LSchneider
Dear Mr. Counsil:
SUBJECT:
APPENDIX J REQUIREMENTS (CONTAINMENT LEAKAGE TESTING)
RE:
Haddam Neck Plant The Comission has issued the enclosed Amendment No. 49 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amend-ment is in response to your applications dated June 27,1977 and Se September 21, 1979.
The amendnent approves changes to the Appendix A Technical Specifications which incorporate requirements of Appendix J to 10 CFR Part 50, Containment Leakage Testing.
Note that the supporting Safety Evaluation (enclosed) includes discussion about exemptions you requested which are not necessary.
It also documents the comitments you have made with respect to Type C testing and the direction at which isolation valve VH-V-507 will be tested. A related Technical Evaluation Report (TER) prepared by our contractor Franklin Research Center is attached to our Safety Evaluation.
f s&P The Notice of Issuance is also enclosed.
g [o Sincerely, n
Original signed by Dennis M. Crutchff old, Chief Operating Reactors Branch #5 Division of Licensing 8205140538 820507 PDR ADOCK 05000213 P
\\ ( e-h\\nY 0
n OFFICE )
- f. 4@.......
r cuawwe )
.U.
....Lc c
,C,,rgp,
T Q.r.. fj.e.).d. ;..G i.no C
.k
.Q..
- b...........
.f."
.I.
..d..
one>
NRC FORM 3 8 0480@RCM 0da OFFICIAL RECORD C.OPY usam mi-33%
' r,1 i
F 4
Mr. W. G. Counsil
-2 May 7, 1982
Enclosures:
1.
Amendment No. 49 to License No. DPR-61 2.
Safety Evaluation, including its attached TER 3.
Notice of Issuance cc w/ enclosures:
See next page i
carecr y sunnzr >
on i= >
i hac ronu sia oow Nacu cao OFFICIAL RECORD COPY usa.o i..i_ m.u
Mr. W. G. Counsil
~ May 7,1982 cc Day *, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Superintendent Haddam Neck Plant RFD #1' Post Office Box 127E East Hampton, Connecticut 06424 Mr. Richard R. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06115 U. S. Environmental Protection Agency -
Region I Office ATTN:
Regional Radiation Representative JFK Federal Building I
Boston, Massachusetts 02203
.,. t Resident Inspector Haddam Neck Nuclear Power Station l
c/o 'J.
S. NRC l
East Haddam Post Office l
East Haddam, Connecticut 06423 Ronald C. Haynes, Regional Administrator Nuclear Regulatory Ccmmission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 l
[
l
_ _.