7" s y
u f*
MAR 2 61982 DISTRIBUTION:
Docket File Docket Nos. 50-348 NRC PDR 50-364 Local PDR ORB #1 Rdg 6
DEisenhut
- o OELD o>
Mr. F. L. C1ayton OI&E (1) g Senior Vice President EReeves (2.)
t Alabama Power Company fMiWiems dCbo
/y N-IVED Post Office Box 2641 CParrish S
MRg IO82A E
Dimingham, Alabama 35291 NSIC ACRS (10)
Dear Mr. Clayton:
JHeltemes 7
p FRC 4
SUBJECT:
ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL
/
,y EQUIPMENT REQUEST FOR ADDITIONAL INFORMATION Joseph H. Farley Unit No. I and No. 2 On January 19 and February 1,1982 we requested additional infomation concerning the Enyfronmental Qualification (EQ) of Safety-Related Electrical t
Equipmeht for Unit I and Unit 2, respectively. Our contractor (Franklin Research Center) identified infomation, in most cases referenced from your submittals, which we need in order to complete our review. This request is a supplement to the January 19 and February 1,1982 letters.
We request that you supply the infomation shown on Enclosure 1 for Unit I and Enclosure 2 for Unit 2 within 30 days of the date of this letter.
Please send a full submittal to Franklin Research Center (address in Enclosure) and only the cover letter to us. Address the letter to S. Varga, Chief, Operating Reactors Branch No.1.
Please contact your Project Manager for further assistance in this regard.
This request for information was approved by the Office of Management and Budget under clearance number 3150-0055 5;hich expires May 31, 1983 Sincerely.
' Original aigned by S. A. Varga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing i
Enclosure:
Request for Additional Infomation cc w/ enc 1:
See next page 8204140517 B20326 PDR ADOCK 05000349 P _DR.
.p o.P wwm >..EME,, hEs.:ms,<,
,f.mi.u.5ms....,..,. v.a,.r.,,...,...
. 31X18 2...
3LNL82...
..&.?2 am>
'.nc ronu ais oomncu om OFFICIAL RECORD COPY usa m e - m es t
5 Mr. F. L. Clayton, Jr.
Alabama Power Company cc: Mr. W. O. Whitt Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabana 35291 Ruble A. Thomas, Vice President Southern Company Services, Inc.
Post Office Box 2525 Birmingham, Alabama 35202 Georae F. Trowbridge, Esquire Shaw, Pittman, potts and Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 Robert A. Buettner, Esquire Balch, Binghan, Baker, Hawthorne, Williams and Ward Post Of fice Box 306 Birmingham, Alabama 35201 George S. Houston Memorial Library 212 W. Burdeshaw Street Dothan, Alabama 36303 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 24-Route 2 Columbia, Alabama 36319 Mr. R. P. Mcdonald Vice President - Nuclear Generation Alabama Power Company P.O. Box 2641 Birmingham, Alabama 35291 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 i
i O
Enclosura 1 REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT ENVIRONMENTAL QUALIFICATION JOSEPH M. FARLEY NUCLEAR PLANT, UNIT No.1 This request for additional information is the result of an evaluation of the information provided by APCo letters dated April 29, 1980 and August 25, 1981. This request is a supplement to our January 19, 1982 letter. Please provide the following information to:
Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 1.
Reference 4 does not provide adequate detail with respect to identification of TMI Action Plan equipment installed as of 1/1/81.
a.
Identification of TMI Action Plan equipment installed with implementation dates after 1/1/81 is requested.
b.
The correlation of the equipment items identified with the specific sections of NUREG-0737 [6] presented below is requested.
IIEl.2, IIE4.2, IIE3.1, IIG1, IIF2, IID3, IIK3.12 (Wx), IIK3.9 (Wx), IIB 3, IIE4.1.
(The correlation is needed to ensure that all items are included in the
- review, e.g.,
if a transmitter is identified as a TMI Action Plan item, are the cable and terminal blocks associated with the device also identified?]
c.
The approximate installation date for the TMI Action Plan equipment items is requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.
2.
The qualification documents, e.g.,
the actual test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified TMI Action Plan equipment are requested.
(The identification of those reports considered to be proprietary is requested so that proper t
control of documents can be maintained.]
I l
1 j
. 3.
Wnere the Licensee has a standard owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested in or4r to incorporate it into the review.
REFERENCES 1.
F. L. Clayton, Jr. and R. P. MacDonald I4tter to J. P. O'Reilly, NRC
Subject:
Response to IE Bulletin 79-013 for Farley Nuclear Plant Unit 1 Alabama Power Company, 29-April-1980 2.
F. L. Clayton, Jr.
Letter to J. P. O'Reilly, NRC
Subject:
Joseph M. Farley Nuclear Plant Unit 1; Response to SER (Revision 5 to July 30, 1980 Submittal) l Alabama Power Company, 25-August-81 3.
Telephone Memorandum Dated July 24, 1981 J. A. Murphy (FRC) Conversation with E. Reeves (NRC, P/M, Farley 1)
Subject:
Request for Additional Information, Farley 1 (MI Action Plan) 4.
F. L. Clayton, Jr.
Letter to J. P. O'Reilly, NRC
Subject:
Alabama Power Company's Response and Revised Responses to IEB 79-01B, Dated 4/4/80, 7/30/80, 10/30/80, 11/12/80 and 2/2/81 Alabama Power Company, 12-Feb-81 l
S.
Office of Nuclear Reactor Regulation I
Safety Evaluation Report for Joseph M. Farley F NT. ear Plant Unit 1 Environmental Qualification of Safety-Related Electrical Equipment i
NRC, 21-May-81 6.
NUREG-0737, " Clarification of MI Action Plan Requirements" NRC, November 1980 l
l I
l ranklin Research Center A Denman of The Fransen ensmane l
1 l
I
=
i i
REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT ENVIRONMENTAL QUALIFICATION JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 This request for additional information is the result of an evaluation of the infonnation provided by APCo letters dated Septem6er 2,1980 and July 1, 1981. This request is a supplement to our Fe6ruary 1,1982 letter. Please provide the following information to:
Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 1.
Reference 2 does not provide adequate detail with respect to identification of MI Action Plan equipment installed as of 1/1/81.
a.
Identification of all MI Action Plan equipment installed as of 1/1/81 is requested.
l b.
Identification of MI Action Plan l
equipment installed with implementation dates after 1/1/81 is requested.
c.
The correlation of these equipment items with the specific sections of NUREG-0737 (4) presented below (as applicable) is requested.
IIE1.2, IIE4.2, IIE3.1, IIG1, IIF2, IID3, IIE3.12 (Wx), IIK3. 9 (Wx),
IIE2.10(B&W), IIB 3, IIE4.1.
(The correlation is needed to ensure that all items are included in the
- review, e.g.,
if a transmitter is identified as a mI Action Plan item, are the cable and terminal blocks associated with the device also l
identified?]
d.
For all installed MI Action Plan equipment identified, a System Component Evaluation Worksheet (SCEN) (in accordance with 79-015 format) is requested.
I I The approximate installation date for the l !
e.
TMI Action Plan equipment items is i '
requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.
l l i
.. ~....
.' 2.
The qualification documents, e.g., the actual test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified MI Action Plan equipment are requested. [The identification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.]
3.
Where the Licensee has a standard owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it. into the review.
REFERENCES 1.
F. L. Clayton Letter to A. Schwencer, NBC.
Subject:
Joseph M. Farley Nuclear Plant Unit 2, Environmental Qualification of Class IE Electrical Equipment-NUREG 0588 Alabama Power, 12-Sept-80 2.
F. L. Clayton Letter to B. J. Youngblood, NRC.
Subject:
Joseph M. Farley Nuclear Plant Unit 2, NPF-8 License Condition 2.C.(18) (b)
Alabama Power, 1-July-81 3.
' office of Nuclear Reactor Regulation Safety Evaluation Report for Joseph M. Farley Nuclear Plant Unit 2 Environmental Qualification of Safety-Related Electrical Equipment NRC, 19-March-81 4.
NUREG-0737, " Clarification of M I Action Plan Requirements" NRC, November 1980 e
U A h W The Pasume m
~