Forwards IE Insp Repts 50-438/82-04 & 50-439/82-04 on 820222-26.No Noncompliance Noted
ML20050N351
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/22/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20050N433 List:
References
NUDOCS 8204140339
Download: ML20050N351 (2)


See also: IR 05000438/1982004

Text

,

.~

,-

b

  • 2 2 '882

gs

f-

N;;

'

,/

Tennessee Valley Authority

,J

g

ATTN: Mr. H. G. Parri s

Q

,

,pp g

T

Manager of Power

. , c; ' j)

f-

Q:# 12

~

500A Chestnut Street Tower II

,

Chattanooga, TN 37401

ts

, . , . - ., ..c

g

. , ,

-

'h

Gentlemen:

4e

Y

a

q

Subject: Report No.k38/82-0I[}ti-439/82-04

This refers to the routine safety inspection conducted by Mr. J. W. York of this

office

on

February 22-26,

1982,

of

activities

authorized

by

NRC

Construction Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility and to

the discussion of our findings held with Mr. W. R. Dahnke, Project Manager, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this of fice, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. Cantrell, Acting Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

Enclosure (See Page 2)

8204140339 020322

PDR ADOCK 05000438

'""

Sfo/g

"

.-

Tennessee Valley Authority

2

Enclosure:

Inspection Report Nos. 50-438/82-04,

50-439/82-04

-

cc w/ encl:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

W. R. Dahnke, Project Manager

D. L. Terrill, Project Engineer

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

Document Management Branch

State of Tennessee

NRC Resident Inspector

.

d

"hb"

"'pt

JWYors:es

gb

erdt

RVCrlenjak

FSCantrell

3/ Ei/82

3//4/82

3/{ FS2

3/ 2/82

-

A

-