Forwards IE Insp Repts 50-348/82-07 & 50-364/82-06 on 820223-26.No Noncompliance Noted
ML20050L034
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/24/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20050L056 List:
References
NUDOCS 8204140242
Download: ML20050L034 (2)


See also: IR 05000348/1982007

Text

1

-

.

Co

_

MAR 2 4 1982

byN@h,/

Alabama Power Company

/

ATTN: Mr. R. P. Mcdonald

'S

Vice P esident-Nuclear Generation

V

/ \\' -

h

0 a \\{b

P. O. Box 2641

Birmingham, AL 35291

H

- 4

fp'

g,i

-

-> 3

Gentlemen:

~d

fj

'

>

')b> '

A

Subject: Report No

2-07, 50-364/82-06

W$

This refers to the routine safety inspection conducted by Mr. W.'P: Ang of this

office on February 23-26, 1982, of activities authorized by NRC License

Nos. NPF-2 and NPF-S for the Farley Nuclear Plant facility and to the discussion

of our findings held with Mr. R. George at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this of fice, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

o

A

D

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure (See Page 2)

8204140242 820324

PDR ADOCK 05000348

S fo(y

"""

,-

,o

.

MAR 2 4 1982

Alabama Power and Light Co.

2

Enclosure:

Inspection Report Nos. 50-348/82-07,

50-364/82-06

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

O. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. C. Carr, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bcc w/ encl:

Document Management Branch

State of Alabama

NRC Resident Inspector

RII

RII

RII,

RII

w i.x

[jy

WPAng:es

ARHerdt

JFIlogge

F,

ng

3/f/82

3/g/82

3/g/82

/)f82

t