Forwards IE Insp Repts 50-508/82-05 & 50-509/82-02 on 820201-28.No Noncompliance Noted
ML20050K671
Person / Time
Site: Satsop
Issue date: 04/01/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20050K693 List:
References
NUDOCS 8204140228
Download: ML20050K671 (2)


See also: IR 05000508/1982005

Text

4

'

V;'

  • (.

~y

T

f

.

APR

1 1982

w

fl

D

6

m

g 'c{

B

Docket No. 50-508, 50-5 6 9 (CON)

-

m

. Q-

gy 2

+ - -

sogl o

c 3 ~9

-

cQ,ce?r:n g

'

0

L's

,

Washington Public Power Supply System

'/ x

fO/

Vy

,,s \\

P. O.

Box 1223

f

'

Elma, Washington 98541

N

Attention:

Mr.

R.

S.

Leddick

Program Director, WNP-3/5

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Projects Nos. 3 and

5 (WNP-3/5)

This refers to the inspection conducted by Mr.

W.

G. Albert of this

office on February 1-28, 1982, of activities authorized by NRC Con-

struction Permit Nos. CPPR 154 and CPPR 155, and to the discussion

of findings with Mr.

N.

C. Kaufman and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified

within the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the HRC Public Document Room unless

you notify this office, by telephone, within ten days of the date

of this letter and submit written application to withhold information

contained therein within thirty days of the date of this letter.

Such application must be consistent with the requirements of

2. 7 90(b) (1) .

hg}f

8204140228 820401

PDR ADOCK 05000508

[

I

G

PDR

"'C'> .R.V.!1 . ,[.

.

'

sunNaur) W. . A l. e r. t

R. .

odds

T.

i.s h o. .p...

.

.. .. .

.

..

.

.

,

.

" " > a /3/./.a2.. .,.6..Lt.u... .. 4/../..I.82,,

,,,,,,,l

,, ,,

,, ,,

,,

,, , ,

, ,,,, ,,

,,,

nac ronu ate no eoinacu o24o

OFFICIAL RECORD COPY

, m = -32n 2.

. . . . .

. . ...

_.

._,

_ _ _

..- _

-

_

_ ._

,

. .

.

Washington Public Power Supply System -2-

APR

y ;ggg

i

Should you have any questions concerning this inspection, we will

be glad to discuss them with you.

-

Sincerely,

Jiif(!'!!i sp??p t-

Y

f? *n'i

'

T. W.

Bishop. Acting Chief

Reactor Construction Projects Branch

-

.

Euclosure:

,

NRC Inspection Report

Nos. 50-508/82-05 and 50-509/82-02

cc w/o enclosure:

R.

B.

Glasscock, Quality Assurance Director, WPPSS

Dale Dobson, Project Manager

l

G. C. Sorensen, WPPSS

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

RHE (w/o enclosure)

'

Resident Inspector

f

,

4

.

.

i

i

d

I,

1

, - - -

y,

..-----.o

, - . - , , - - - - ~ , - -

-s.,y-

.,,e-w,

reyy,--,-,

.,-.,r,,..

,m

~

.-,,yr.r,q,,--.vy,_,,.,vy.vc,,,,,

, - , . -

m.,,,,v-..-w.,w-