ML20050K671
| ML20050K671 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 04/01/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20050K693 | List: |
| References | |
| NUDOCS 8204140228 | |
| Download: ML20050K671 (2) | |
See also: IR 05000508/1982005
Text
4
'
V;'
- (.
~y
T
f
.
APR
1 1982
w
fl
D
6
m
g 'c{
B
Docket No. 50-508, 50-5 6 9 (CON)
-
m
. Q-
gy 2
+ - -
sogl o
c 3 ~9
-
cQ,ce?r:n g
'
0
L's
,
Washington Public Power Supply System
'/ x
fO/
Vy
,,s \\
P. O.
Box 1223
f
'
Elma, Washington 98541
N
Attention:
Mr.
R.
S.
Leddick
Program Director, WNP-3/5
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Projects Nos. 3 and
5 (WNP-3/5)
This refers to the inspection conducted by Mr.
W.
G. Albert of this
office on February 1-28, 1982, of activities authorized by NRC Con-
struction Permit Nos. CPPR 154 and CPPR 155, and to the discussion
of findings with Mr.
N.
C. Kaufman and other members of your staff
at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified
within the scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the HRC Public Document Room unless
you notify this office, by telephone, within ten days of the date
of this letter and submit written application to withhold information
contained therein within thirty days of the date of this letter.
Such application must be consistent with the requirements of
2. 7 90(b) (1) .
hg}f
8204140228 820401
PDR ADOCK 05000508
[
I
G
"'C'> .R.V.!1 . ,[.
.
'
sunNaur) W. . A l. e r. t
R. .
odds
T.
i.s h o. .p...
.
.. .. .
.
..
.
.
,
.
" " > a /3/./.a2.. .,.6..Lt.u... .. 4/../..I.82,,
,,,,,,,l
,, ,,
,, ,,
,,
,, , ,
, ,,,, ,,
,,,
nac ronu ate no eoinacu o24o
OFFICIAL RECORD COPY
, m = -32n 2.
. . . . .
. . ...
_.
._,
_ _ _
..- _
-
_
_ ._
,
. .
.
Washington Public Power Supply System -2-
APR
y ;ggg
i
Should you have any questions concerning this inspection, we will
be glad to discuss them with you.
-
Sincerely,
Jiif(!'!!i sp??p t-
Y
f? *n'i
'
T. W.
Bishop. Acting Chief
Reactor Construction Projects Branch
-
.
Euclosure:
,
NRC Inspection Report
Nos. 50-508/82-05 and 50-509/82-02
cc w/o enclosure:
R.
B.
Glasscock, Quality Assurance Director, WPPSS
Dale Dobson, Project Manager
l
G. C. Sorensen, WPPSS
bcc: DMB/ Document Control Desk (RIDS)
Distributed by RV:
State of WA (Lewis)
RHE (w/o enclosure)
'
Resident Inspector
f
,
4
.
.
i
i
d
I,
1
, - - -
y,
..-----.o
, - . - , , - - - - ~ , - -
-s.,y-
.,,e-w,
reyy,--,-,
.,-.,r,,..
,m
~
.-,,yr.r,q,,--.vy,_,,.,vy.vc,,,,,
, - , . -
m.,,,,v-..-w.,w-