Text
4
0
O[/d cd
'
MAR 0 31982
i
Tennessee Valley Authority
'
ATTN: Mr. H. G. Parris
Manager of Power
.
500A Chestnut Street Tower II
'
Chattanooga, TN 37401
>
Gentlemen:
Subject:
Report Nos.@38/82-0Dnd 50-439/82-02
f
This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.
of this office on January 1-31, 1982, of activities authorized by NRC
Construction Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility.
Our
'
preliminary findings were discussed with Mr. W. R. Dahnke, Project Manager, at
>
the conclu, ion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
,
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
'
i
Two new unresolved items are identified in the enclosed inspection report. These
items will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
!
l
8204140185 820405
PDR ADOCK 05000438
G
,
--- -- --__
.
- _ . _ - _ .
-
- - - .
. -
. . . - - .
. .
.
-
-
- -
- -
.
.
.
l
'
-
.
Tennessee Valley Authority
2
MAR 03ggy
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
'
Sincerely,
F. S. Cantrell, Acting Chief
Reactor Project Branch 1
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-438/82-02
and 50-439/82-02
cc w/ encl:
H. J. Green, Director of Nuclear Power
A. M. Qualls, Plant Superintendent
W. R. Dahnke, Project fianager
D. L. Terrill, Project Engineer
J. F. Cox, Supervisor, Nuclear
Licensing Section
H. N. Culver, Chief, Nuc15ar Safety
Review Staff
bec w/ encl:
NRC Resident Inspector
Document fianagement Branch
State of Tennessee
,
i
!
i
F
f)
RI
RI
RII
!
JDWil'.
- dt
RLrlenjak
DQuic
FScantrell
2
82
2/t,}/82
/}/82
/}/82