Forwards IE Insp Repts 50-438/82-02 & 50-439/82-02 on 820101-31 & Notice of Violation
ML20050J476
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/03/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20050J170 List:
References
NUDOCS 8204140185
Download: ML20050J476 (2)


See also: IR 05000438/1982002

Text

4

0

O[/d cd

'

MAR 0 31982

i

Tennessee Valley Authority

'

ATTN: Mr. H. G. Parris

Manager of Power

.

500A Chestnut Street Tower II

'

Chattanooga, TN 37401

>

Gentlemen:

Subject:

Report Nos.@38/82-0Dnd 50-439/82-02

f

This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.

of this office on January 1-31, 1982, of activities authorized by NRC

Construction Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility.

Our

'

preliminary findings were discussed with Mr. W. R. Dahnke, Project Manager, at

>

the conclu, ion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

,

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

'

i

Two new unresolved items are identified in the enclosed inspection report. These

items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

!

l

8204140185 820405

PDR ADOCK 05000438

G

PDR

,

--- -- --__

.

- _ . _ - _ .

-

- - - .

. -

. . . - - .

. .

.

-

-

- -

- -

.

.

.

l

'

-

.

Tennessee Valley Authority

2

MAR 03ggy

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

'

Sincerely,

F. S. Cantrell, Acting Chief

Reactor Project Branch 1

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-438/82-02

and 50-439/82-02

cc w/ encl:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

W. R. Dahnke, Project fianager

D. L. Terrill, Project Engineer

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief, Nuc15ar Safety

Review Staff

bec w/ encl:

NRC Resident Inspector

Document fianagement Branch

State of Tennessee

,

i

!

i

F

f)

RI

RI

RII

!

JDWil'.

dt

RLrlenjak

DQuic

FScantrell

2

82

2/t,}/82

/}/82

/}/82