ML20050J395

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/82-16 on 820201-28 & Notice of Violation
ML20050J395
Person / Time
Site: Summer 
Issue date: 03/22/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20050J414 List:
References
NUDOCS 8204140181
Download: ML20050J395 (2)


See also: IR 05000395/1982016

Text

f

1

.

.

-

.

l

MAR 2 21982

Q

g

South Carolina Electric and Gas Company

o

$

ATTN: fir. T. C. Ilichols, Jr., Vice President

(

,

f

V

,

-

Power Production and System Operations

n'

8 .c[g j[e [

$2

P. O. Box 764

2

Columbia, SC 29218

9~

g

1

d[.$i

Gentlemen:

c

!

Subject: Report No. 50-395/82-16

y , n," y, ' '

~g

This refers to the routine safety inspection conducted by fir. J. L. Skolds of

this office on February 1-28, 1982, of activities authorized by NRC Construction

Permit No. CPPR-94 for the V. C. Summer facility. Our preliminary findings were

discussed with fir. W. A. Williams, Jr.,

at the conclusion of the inspection.

i

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Corrective actions to prevent recurrence were completed prior to the

conclusion of this inspection; therefore, a reply is not requested.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the llRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

s/

F. J. Long, Acting Chief

Reactor Projects Branch 2,

Division of Project and

Resident Programs

Enclosure:

See page 2

8?O4140181 820322

PDR ADOCK 05000395

"

"""

Sfoly

.

.

.

.

MAR Z

1962

4

South Carolina Electric & Gas

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-395/82-16

cc w/ encl:

J. B. Knotts, Jr.

O. S. Bradham, Station ihnager

J. P. Harrison, Manager Nuclear

Security

C. A. Price, Manager, Nuclear

Engineering

A. A. Smith, Site QA Coordinator

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

!

g,qh

VBro(/(,0

k

JSkolds:dt

JRogge

wnlee

F Lon

3/ 2/82

3/gq/82

3/)v/82

3g*

g

2

l

7