ML20050J198
| ML20050J198 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/19/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20050J213 | List: |
| References | |
| NUDOCS 8204140174 | |
| Download: ML20050J198 (2) | |
See also: IR 05000413/1982006
Text
-
.
MAR 1 91982
P
O
Duke Power Company
^
' ~
f Y-
'
ATTil: Mr. W. O. Parker, Jr.
Vice President, Steam Production
I
6 [sp%
ZF
5 '# [ y [. )c b 2
P. O. Box 2178
-
a
j
7
Charlotte, flC 28242
Qp
l
Gentlemen:
Af [
Subject:
Report flos.h13/82-Ohnd 50-414/82-06
4
This refers to the routine safety inspection conducted by Mr. P. K. VanDoorn of
this office on January 26 - February 25, 1982, of activities authorized by f1RC
Construction Permit llos. CPPR-116 and CPPR-117 for the Catawba facility and to
the discussion of our findings held with fir. T. H. Robertson, Construction
Engineer, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and sutxnit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
j
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
.
Sincerely,
M
F. J. Long, Acting Chief
Reactor Project Branch 2,
Division of Project and
Resident Programs
Enclosures:
Inspection Report Nos. 50-413/82-06
and 50-414/82-06
cc's See page 2
820414o174 820319
DR ADOCK 05000
tif
,
.
.
Duke Power Company
2
MAR 1 g 1982
cc w/ encl:
J. W. Hampton, Station Manager
J. C. Rogers, Project Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
.
i
i
l
l
l
l
l
RII
Ril
RII
ndf8 Alfn {onis
CBNyant
FJLong
PVanDo
3//9/82
3// t /82
'3////82
3//j/82
l
l
l
l
l