ML20050J198

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/82-06 & 50-414/82-06 on 820126-0225.No Noncompliance Noted
ML20050J198
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/19/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20050J213 List:
References
NUDOCS 8204140174
Download: ML20050J198 (2)


See also: IR 05000413/1982006

Text

-

.

MAR 1 91982

P

O

Duke Power Company

^

' ~

f Y-

'

ATTil: Mr. W. O. Parker, Jr.

Vice President, Steam Production

I

6 [sp%

ZF

5 '# [ y [. )c b 2

P. O. Box 2178

-

a

j

7

Charlotte, flC 28242

Qp

l

Gentlemen:

Af [

Subject:

Report flos.h13/82-Ohnd 50-414/82-06

4

This refers to the routine safety inspection conducted by Mr. P. K. VanDoorn of

this office on January 26 - February 25, 1982, of activities authorized by f1RC

Construction Permit llos. CPPR-116 and CPPR-117 for the Catawba facility and to

the discussion of our findings held with fir. T. H. Robertson, Construction

Engineer, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and sutxnit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

j

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

Sincerely,

M

F. J. Long, Acting Chief

Reactor Project Branch 2,

Division of Project and

Resident Programs

Enclosures:

Inspection Report Nos. 50-413/82-06

and 50-414/82-06

cc's See page 2

820414o174 820319

DR ADOCK 05000

tif

,

.

.

Duke Power Company

2

MAR 1 g 1982

cc w/ encl:

J. W. Hampton, Station Manager

J. C. Rogers, Project Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

.

i

i

l

l

l

l

l

RII

Ril

RII

ndf8 Alfn {onis

CBNyant

FJLong

PVanDo

3//9/82

3// t /82

'3////82

3//j/82

l

l

l

l

l