ML20050G981

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/82-05 & 50-414/82-05 on 820223-26.No Noncompliance Noted
ML20050G981
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/18/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20050G983 List:
References
NUDOCS 8204140092
Download: ML20050G981 (2)


See also: IR 05000413/1982005

Text

,

-

__

__- _ -

__ -

_-

'

.

.

MAR 18 1982

RN(/D,'

Duke Power Company

W

ATTN:

Mr. W. O. Parker, Jr.

d'

-:

Vice President, Steam Production

U

-

y 3'

P. O. Box 2178

C

2

4 ., r

A'h [ .j" j@-

'

Charlotte, NC 28242

1

c

d.b [, /,.

,

Gentlemen:

5

?

o

-

s.

Subject:

Report Nos.6-413/@05'3nd 50-414/82-05

M

M

N.

-

This refers to the routine safety inspection conducted by Mr. W. P. Kleinsorge of

this office on February 23-26, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility and to the discussion

of our findings held with Mr. T. H. Robertson, Construction Engineer, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter

Such application must be consistent with the requirements of

2.790(b)(1).

I

1

l

8204140092 820318

!

gDRADOCK 05000413

PDR

SGoIo

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

'/ /

_ _ _ _ _ _ _ _ .

.

.

-

.

Duke Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

S

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

>

Resident Programs

Enclosure:

Inspection Report Nos. 50-413/82-05

and 50-414/82-05

cc w/ encl:

J. W. Hampton, Station Manager

J. C. Rogers, Project Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

'\\

RII

RII

r

d (I,

\\

\\ 'w4\\

einsorg\\ bf

ARHer t

Algna onis

FJ Lo

'

'

L

3/g/82

3/p'82

3//s/82

3f/ /82

9

..

-