Text
,
-
__
__- _ -
__ -
_-
'
.
.
MAR 18 1982
RN(/D,'
Duke Power Company
W
ATTN:
Mr. W. O. Parker, Jr.
d'
-:
Vice President, Steam Production
U
-
y 3'
P. O. Box 2178
C
2
4 ., r
A'h [ .j" j@-
'
Charlotte, NC 28242
1
c
d.b [, /,.
,
Gentlemen:
5
?
o
-
s.
Subject:
Report Nos.6-413/@05'3nd 50-414/82-05
M
M
N.
-
This refers to the routine safety inspection conducted by Mr. W. P. Kleinsorge of
this office on February 23-26, 1982, of activities authorized by NRC Construction
Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility and to the discussion
of our findings held with Mr. T. H. Robertson, Construction Engineer, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter
Such application must be consistent with the requirements of
2.790(b)(1).
I
1
l
8204140092 820318
!
gDRADOCK 05000413
SGoIo
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
'/ /
_ _ _ _ _ _ _ _ .
.
.
-
.
Duke Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
S
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Project and
>
Resident Programs
Enclosure:
Inspection Report Nos. 50-413/82-05
and 50-414/82-05
cc w/ encl:
J. W. Hampton, Station Manager
J. C. Rogers, Project Manager
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
'\\
RII
RII
r
d (I,
\\
\\ 'w4\\
einsorg\\ bf
ARHer t
Algna onis
FJ Lo
'
'
L
3/g/82
3/p'82
3//s/82
3f/ /82
9
..
-