ML20050F838

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1981
ML20050F838
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/06/1981
From: Ruiter G
WISCONSIN PUBLIC SERVICE CORP.
To:
Shared Package
ML20050F835 List:
References
NUDOCS 8204130388
Download: ML20050F838 (2)


Text

.

.. A V ER AGE DAI LY UNIT POW ER LEVEL o

DCCKET No- 50-305 UNIT- KEWAUNEE COE PLET ED B Y- G. H. RUITER TELEPHONE- 414-388-2560 X225 REPORT ECNTil SEPTEMEER, 1981 AVERAGE DAILY DAY POWER LEVEL .

(M W E- N ET) 1 504 s 2 503 '

3 504 4 508 5 417 '

6 421 7 396 8 470 9 503 10 507 11 503 12 508 13 508 14 512 15 507 16 504 17 512 18 504 19 512 20 512 21 504 22 508 23 512 -

24 504 25 508 26 512 27 512 28 512 29 512 .

30 512 8204130380' g12006 gDRADOCK 05000305 PDR

COCKET 50-305 KE'4AUNEE NUCLEAR POWEB PL A NT SUL1 ARY OF OPE 5 ATING EXPERIENCE

'- September, 1981 s

OPERATIONS: On September 5, test procedure BT-10,. Power Defect Measurement, was started.

On September 7, test procedure RT-10 was completed and . the monthly Turbine Stop Valve Test was performed.

MAINTCNANCE: Repaired and calibrated shield building damper Controls.

- Replaced a faulty circuit board in a volume control tank level transmitter.

Repaired a component cooling valve operator.

Repaired several leaking reactor coolant system sampling valves.

Repaired a damaged fire barrier.

O 9

I l

l e

O L