ML20050F838
| ML20050F838 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 10/06/1981 |
| From: | Ruiter G WISCONSIN PUBLIC SERVICE CORP. |
| To: | |
| Shared Package | |
| ML20050F835 | List: |
| References | |
| NUDOCS 8204130388 | |
| Download: ML20050F838 (2) | |
Text
.
.. A V ER AGE DAI LY UNIT POW ER LEVEL o
DCCKET No-50-305 UNIT-KEWAUNEE COE PLET ED B Y-G.
H.
RUITER TELEPHONE-414-388-2560 X225 REPORT ECNTil SEPTEMEER, 1981 AVERAGE DAILY DAY POWER LEVEL (M W E-N ET) 1 504 s
2 503 3
504 4
508 5
417 6
421 7
396 8
470 9
503 10 507 11 503 12 508 13 508 14 512 15 507 16 504 17 512 18 504 19 512 20 512 21 504 22 508 23 512 24 504 25 508 26 512 27 512 28 512 29 512 30 512 8204130380' g12006 gDRADOCK 05000305 PDR
COCKET 50-305 KE'4AUNEE NUCLEAR POWEB PL A NT SUL1 ARY OF OPE 5 ATING EXPERIENCE September, 1981 s
OPERATIONS:
On September 5, test procedure BT-10,. Power Defect Measurement, was started.
On September 7, test procedure RT-10 was completed and. the monthly Turbine Stop Valve Test was performed.
MAINTCNANCE:
Repaired and calibrated shield building damper Controls.
Replaced a
faulty circuit board in a
volume control tank level transmitter.
Repaired a component cooling valve operator.
Repaired several leaking reactor coolant system sampling valves.
Repaired a damaged fire barrier.
O 9
I l
l e
O L