ML20050E475
| ML20050E475 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 03/25/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20050E476 | List: |
| References | |
| NUDOCS 8204130321 | |
| Download: ML20050E475 (4) | |
See also: IR 05000508/1982001
Text
,,
-
,
4
?
q
'2
s
4
y
sl
~
.
MAR 2 51981
m
/
%
Docket No. 50-508 (C0ti)
(?)
&
b
50[f3
~~
tf
q
J
Washington Public Power Supply System
-
N-
P. O. Box 1223
Elma, Washington 98541
G
- k
-
s
,y
&
Attention: Mr. R. S. Leddick
O / i g i e'
Program Director, WNP-3/5
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Project No. 3 (WNP-3)
This refers to the routine inspection conducted by Mr. D. P. Haist of this
office on January 11-15, 1981 of activities authorized by NRC Construction
Permit No. CPPR-154, and to the discussion of our findings held by Mr. Haist
with Mr. Leddick and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
?etter and submit written application to withhold information contained
therein within thirty days of the date of this letter.
Such application
must be consistent with the requirements of 2.790(b)(1).
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
l
8204130321 8203
{DR ADOCK 05000k8
$ Y OcNdr br
!
T. W. Bishop, Acting Chief
Reactor Construction Projects Branch [
!l
^ " >
- "
. .
.
.
.
.
...
. . . .
.. . .
.
.. ...... ..........
..
.. .... .
. .
.
.. .
' " > . k .$ . . .. .. k . .
. .....
.h.......
. ..
.
. ..
.
... ........ .
...... .... ... ..
. . ...... ... .
usc rosu ais no so scu o2a
OFFICIAL RECORD COPY
^ m ea2n24
i
r
-
-
,
l
Washington Public Power Supply System
-2-
Enclosure:
IE Inspection Report
f:o. 50-508/32-01
cc w/o enclosure:
R. B. Glasscock, Quality- Assurance Director, UPPSS
Dale Dobson, Project flanager, llPPSS
bcc: Df10/Docunent Control Desk (RIDS)
Distributed by RV:
State of ilA (Lewis)
Resident Inspector (2)
Engelken (1tr)
j,(
g
UNITED STATES
,
{
g
NUCLEAR REGULATORY COMMISSION
g,
y
REGION V
o,
g
1450 MARIA LANE. SUITE 260
%
,d
WALNUT CREEK. CAUFORNIA 94696
NAR 2 51982
Docket No. 50-508 (C0N)
. . . .
Washington Public Power Supply System
P. O. Box 1223
Elma, Washington 98541
.
Attention: Mr. R. S. Leddick
Program Director, WNP-3/5
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Project No. 3 (WNP-3)
This refers to the routine inspection conducted by Mr. D. P. Haist of this
office on January 11-15, 1981 of activities authorized by NRC Construction
Permit No. CPPR-154, and to the discussion of our findings held by Mr. Haist
with Mr. Leddick and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application co withhold information contained
therein within thirty days of the date of this letter.
Such application
must be consistent with the requirements of 2.790(b)(1).
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
T. W. Bishop, Acting Chief
Reactor Construction Projects Branch
.
Washington Public Power Supply System
-2-
MAR 2 51982
,
Enclosure:
IE Inspection Report
No. 50-508/82-01
cc w/o enclosure:
-"
R. B. Glasscock, Quality Assurance Director, WPPSS
Dale Dobson, Project Manager, WPPSS
.
-
. - - - - -
-
-
.
.
-