See also: IR 05000155/1982002
Text
,
O
.
MAR 2 4 82
Docket No. 50-155(DETP)
(5 \\
(o
Consumers Power Company
(7
1
ATTN:
Mr. R. B. DeWitt
,i
g g~ "% . ,01)
Vice President
,
.[
'9
'
'
' 7 . _, 7932 h
Nuclear Operations
' i
^ ' -
- . .
212 West Michigan Avenue
" i.[?$praya
Lf" 4
S
'.[lx
Jackson, MI 49201
'
Gentlemen:
til[_,g\\6
%
--
This refers to the special safety inspection conducted by J. F. Norton of
this office on February 25, 1982, of activities at Big Rock Point Nuclear
Plant authorized by NRC Operating License No. DPR-6 and to the discussion
of our findings with Mr. C. Hartman and others at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this of fice
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new duc date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the'
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
f fl
G
//
.
,
&
Consumers Power Company
2
MAR 2 4 col
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" original Sicnod by C.E. Wsifudi
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosure:
Inspection Report
No. 50-155/82-02(DETP)
cc w/ encl:
D. J. VandeWalle, Nuclear
Licensing Administrator
C. J.11artman, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
RIII
RIIL
RIIIn
R
[m j
k jp
/p
4
RIII
m
Nddelipyy
TWms
Boyd t ^g
Norton/so
t
Litt
3/20/82
n;l
3\\b