Forwards IE Insp Rept 50-445/82-02 on 820101-0228.No Noncompliance Noted
ML20050D733
Person / Time
Site: Comanche Peak 
Issue date: 03/26/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20050D740 List:
References
NUDOCS 8204120386
Download: ML20050D733 (2)


See also: IR 05000445/1982002

Text

-

,.

'

!I

pn :*

.

.

J

$ 0 MAR 1E2

Docket:

50-445/82-02

e I is

{

c3

$

q' .3c5.00

3

Texas Utilities Generating Company

2

ATTN:

Mr. R. J. Gary, Executive Vice

gog1 M O y

-

.

-

g;su bgygrgcjf

President and General Manager

(

2001 Bryan Tower

r

Dallas, Texas 75201

g

g

'

Gentlemen:

I d

This refers to the inspection conducted by our Senior Resident Reactor

Inspector, Mr. D. L. Kelley, during January 1 to February 28, 1982, of

activities authorized by NRC Construction Permit CPPR-126 for the

Comanche Peak facility, Unit 1, and to the discussion of our findings

with Mr. J. C. Kuykendall and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were

identified.

One new unresolved item is discussed in paragraph 5 of the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

1

PPS-A T%

RPS-A

RPB1 yg

DRRP

'

,'u

AD/IE

RA/RIV f /

/

DLKelley/dm

TWesterman

GLMadsen JGagl- rdo

[KVSe

,it ,JTCol t'ips

3/19/82

3/4 /82

3//1/82

3/13/

jf3

3 M / 2s

49

4

j

150/

3

8204120386 820326

PDR ADOCK 05000445

r

j

G

PDR

+

-

f

~~

l

.. . c

.

.

Texas Utilities Generating

2

Company

gg

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

..o r igi n al signed byt

g, p. MADSEN"

G. L. Madsen, Chief

Reactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-445/82-02

cc w/ encl:

Texas Utilities Generating Company

ATTN:

Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas 75201

bcc to DMB (IE01)

bec distrib. by RIV:

BC

0. Kelley

PM

T. Westerman

AE00

R. Taylor

ELD

C. Wisner

IE FILE

TPB

IE/RPRIB

RPB2

NRR/DHFS

INF0 SYSTEMS

NRR/0LB

J. Collins

RAD ASMT BR

Texas Dept. Health Resources

RESEARCH

Juanita Ellis

POR:HQ

Geoffrey M. Gay

LPOR

Richard W. Lowerre, Esq.

NSIC

Richard Fouke

NTIS

RIV File

I

,

!