ML20050D733
| ML20050D733 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/26/1982 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20050D740 | List: |
| References | |
| NUDOCS 8204120386 | |
| Download: ML20050D733 (2) | |
See also: IR 05000445/1982002
Text
-
,.
'
!I
pn :*
.
.
J
$ 0 MAR 1E2
Docket:
50-445/82-02
e I is
{
c3
$
q' .3c5.00
3
Texas Utilities Generating Company
2
ATTN:
Mr. R. J. Gary, Executive Vice
gog1 M O y
-
.
-
g;su bgygrgcjf
President and General Manager
(
2001 Bryan Tower
r
Dallas, Texas 75201
g
g
'
Gentlemen:
I d
This refers to the inspection conducted by our Senior Resident Reactor
Inspector, Mr. D. L. Kelley, during January 1 to February 28, 1982, of
activities authorized by NRC Construction Permit CPPR-126 for the
Comanche Peak facility, Unit 1, and to the discussion of our findings
with Mr. J. C. Kuykendall and other members of your staff at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of the inspection, no violations or deviations were
identified.
One new unresolved item is discussed in paragraph 5 of the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter and submit written
application to withhold information contained therein within 30 days of the
date of this letter.
Such application must be consistent with the
requirements of 2.790(b)(1).
1
PPS-A T%
RPS-A
RPB1 yg
DRRP
'
,'u
AD/IE
RA/RIV f /
/
DLKelley/dm
TWesterman
GLMadsen JGagl- rdo
[KVSe
,it ,JTCol t'ips
3/19/82
3/4 /82
3//1/82
3/13/
jf3
3 M / 2s
49
4
j
150/
3
8204120386 820326
PDR ADOCK 05000445
r
j
G
+
-
f
~~
l
.. . c
.
.
Texas Utilities Generating
2
Company
gg
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
..o r igi n al signed byt
g, p. MADSEN"
G. L. Madsen, Chief
Reactor Project Branch 1
Enclosure:
Appendix - NRC Inspection Report 50-445/82-02
cc w/ encl:
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201
bcc to DMB (IE01)
bec distrib. by RIV:
0. Kelley
T. Westerman
AE00
R. Taylor
ELD
C. Wisner
IE FILE
TPB
IE/RPRIB
RPB2
NRR/DHFS
INF0 SYSTEMS
NRR/0LB
J. Collins
RAD ASMT BR
Texas Dept. Health Resources
RESEARCH
Juanita Ellis
POR:HQ
Geoffrey M. Gay
LPOR
Richard W. Lowerre, Esq.
Richard Fouke
RIV File
I
,
!