ML20050D375
| ML20050D375 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/26/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20050D380 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8204120168 | |
| Download: ML20050D375 (2) | |
See also: IR 05000255/1982005
Text
e
.
F
Mo o A G82
g/g
.g,
)
C)'
i,'
c3 g]
O
g
\\
'/'l
"% u m
Docket No. 50-255(DPRP)
-)
-
gg
$ RYH
T2
'
( ~d ,'.er3(g
,
\\
Q
Consumers Power Company
NITN:
Mr. R. B. DeWit t
tj
8
Vice President
M.
Nuclear Operations
%7 Wj_g,
212 West Michigan Avenue
Jackson, MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
B. L. Jorgensen and J. K. IIeller of this office on February 1-5, 8-12,
and 16-26, 1982, of activities at the Palisades Nuclear Generating Plant
authorized by NRC Provisional Operating License No. DPR-20 and to the
discussion of our findings with Mr. R. W. Montross and others of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence. Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
matter at this time.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
8204120168 820326
PDR ADOCK 05000255
- [g()
G
o /
r
.
Consumers Power Company
2
March 26, 1982
be accompanied by an af fidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity-
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-255/82-05(DPRP)
cc w/encls:
D. J. VandeWalle, Nuclear
Licensing Administrator
R. W. Montross, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
.
RIII g
RI
RIIIj
Boyd/so
Kn6p
Spe'stard