Forwards IE Insp Rept 50-373/82-07 on 820312.No Noncompliance Noted
ML20050C885
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 03/24/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20050C886 List:
References
NUDOCS 8204090434
Download: ML20050C885 (2)


See also: IR 05000373/1982007

Text

.

e

MAR 2dl902

W..

282

A

&

6

g

Docket No. 50-373(DETP)

.

& * AECEWED

9<

Commonwealth Edison Company

4pNO

-

.

'~

NITN:

Mr. Cordell Reed

-~

g

g

~

Vice President

%

g'

Post Office Box 767

ng

4

Chicago, IL 60foO

t

//

Gentlemen:

A

i

This refers to the special safety inspection conducted by Messrs. J. Grobe

and R. Mendez of this office on March 12, 1982, of activities at LaSalle

County Nuclear Station, Unit 1, authorized by NRC Construction Permit

No. CPPR-99 and to the discussion of our findings with Mr. H. Massin at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

te file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

8204090434 820324

DR ADOCK 05000

/

SQ

. _ _ _

_ . . -

_.

__

.

_ _ _ _ _ .

t

w

<

f

Commonwealth Edison Company

2

NES 25 UU2

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

Ocigind Signcd b,y C.E. MorCliuG"

C. E. Norelius, Director

Division of Engineering and

Technical Programs

Enclosure:

Inspection' deport

No. 50-373/82-07(DETP)

cc w/ enc 1:

Louis 0. De1 George, Directpr

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

1

DMB/ Document Control Desk (RIDS)

a'

Resident Inspector, RIII

,

Mary Jo Murray, Office of

j

Assistant Attorney General

!

.I

1

I

RIII

RIII

RIII

RIII

/

RIII

RII

O )4 0 G.

A'. At .

$A

h

0

-

bitti$'

'

i

Grobe/so

Mendez

Wf1Tiams

Walk'er./fL-

h te ius

,

3/20/82

pl7

gh)

>

,

.

.

.

. .

.

. . .

.

. . - - .

. .

_

. , _ _ _

_

_

. -

.

. .

_ ,

,

_ _ _ _

._a,._._

. _ ,