ML20050C542

From kanterella
Jump to navigation Jump to search
Requests Instrumentation & Control Sys Branch Technical Position Re Shutdown Capability from Outside Control Room Be Forwarded to Applicant
ML20050C542
Person / Time
Site: Waterford, 05000383  Entergy icon.png
Issue date: 02/23/1982
From: Speis T
Office of Nuclear Reactor Regulation
To: Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML20050C538 List:
References
NUDOCS 8204090037
Download: ML20050C542 (1)


Text

__

[

ac pa aso,

UNITED STATES c

jo, NUCLEAR REGULATORY COMMISslON

{g

(

g WASHINGTON, D. C. 20555 5., '

j

~'

FEB 2 31983 MEMORANDUM FOR: Robert L. Tedesco, Assistant Direc. tor for Licensing Division of Licensing FROM:

Themis P. Speis, Assistant Director for Reactor Safety Division of Systems Integration

SUBJECT:

WATERFORD UNIT 3 - ICSB POSITION ON REMOTE SHUTDOWN CAPABILITY Plant Name: Waterford 3 Docket No.:

50-382 Licensing Status: 0L Responsible Branch: LB #3 Project Manager:

S. Black Review Branch:

ICSB Review Status:

Incomplete The Instrumentation & Control Systems Branch (ICSB) review of the Waterford Unit 3 local control panel (LCP) has identified concerns regarding the capability of the current LCP design 'to comply with the subject staff position. The applicant has requested to receive the staff position regarding shutdown capability from a location outside the main control room in order to better understand staff concerns and to aid in further LCP design considerations.

Pursuant to this request, enclosed is the ICSB position for remote shutdown capability for the Waterford 3 plant. We request that this position be fomarded to the applicant.

b g

Themis P. Speis, Assistant Director for Reactor Safety Division of Systems Integration

Attachment:

As stated cc:

R. Mattson F. Rosa

0. Parr R. Capra S. Black F. Miraglia J. Rosenthal C. Rossi R. Stevens

Contact:

vens, ICSB X59 B204090037 820319 PDR ADOCK 05000382 A

PDR

.