Forwards IE Insp Repts 50-272/82-07 & 50-311/82-06 on 820208-11 & 17-18 & Notice of Violation
ML20050C413
Person / Time
Site: Salem  
Issue date: 03/22/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Uderitz R
Public Service Enterprise Group
Shared Package
ML20050C415 List:
References
NUDOCS 8204080481
Download: ML20050C413 (2)


See also: IR 05000272/1982007

Text

r

-

,,,.,, o

. .

. . .

MAR 2 21882

k.\\

'

Docket Nos. 50-272

50-311

g

Public Service Electric and Gas Company

RCE!TD

3

ATTN: Mr. Richard A. Uderitz

2

app 7 7902b ~

Vice President - Nuclear

6h cm,,,2M?jue

Mail Code T15A

muc w

P4c

g

P. O. Box 570

Newark, New Jersey 07101

,

Gentlemen:

Subject:

Inspection No. 50-272/82-07 and 50-311/82-06

This refers to the routine safety inspection conducted by Mr. E. T. Shaub of

this office on February 8-11 and 17-18, 1982 at the Salem Nuclear Generating

Station, Hancock's Bridge, New Jersey and at your Newark, New Jersey corporate

office of activities authorized by NRC License Nos. OPR-70 and DPR-75 and to

the discussions of our findings held by Messrs. Shaub and Meyer with Messrs.

J. Driscoll, J. Boettger, R. Mittl, and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the items of

noncompliance brought to your attention in letters dated May 6, 1980 (Item A)

and July 24, 1981 (Item A). We have no further questions regarding the steps

you took to correct Item A of the May 6, 1980 letter. With regard to Item A

in the July 24, 1981 letter, this was not fully corrected.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of noncompli-

ance has been categorized into the levels described in the Federal Register

Notice (45 FR 66754) dated October 7, 1980.

You are required to responc to

this letter and in preparing your response, you should follow the instructions

t<

in Appendix A.

1

RI:0EPOS

RI:DEPOS RI:DETP

RI:DETPf

-

'

Yl1

$;W162

Shaub/ gwc

Meyer

Napuda,

Caphto

([

3/12/82

OFFICIAL RECORD COPY

3 $

4

%

\\

8204000481 820322

S

PDR ADOCK 05000

L

'/

3

.

.

.

.

.

.

Public Service Electric and Gas Company

2

In addition, the attached inspection report identifies four unresolved items,

three of which concern the manner in which you me t some of the administrative

e

control requirements of the Technical Specifications.

In your response to

this letter please address these unresolved items and specifically state the

actions you are taking to resolve these items, the proposed schedule for these

actions, and the measures taken in the interim to assure you effectively

implement the administrative control requirements of the Technical Specifications.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1). The telephone riotification of your intent to request withholding,

or any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

The responses directed by this notice are not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction Act

of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,'l

s

SPIrisal Stened Bys 6.EJ M

Thomas T. Itartin, Director

%fvisionofEngineeringand

Technical Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined NRC Region I Inspection Report Number 50-272/82-07 and

50-311/82-06

cc w/ enc 1:

R. L. Mitt 1, General Manager - Corporate QA

H. J. Midura, General Manager - Salem Operations

E. A. Liden, Manager - Nuclear Licensing and Regulation

R. Fryling, Jr., Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Jersey

NRC Resident Inspector

bec w/ enc 1:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

E. Greenman, RI

0FFICIAL RECORD COPY