Letter Sequence Other |
|---|
|
|
MONTHYEARML20005B1351981-07-0101 July 1981 Responds to NUREG-0737,Item II.D.1.A Re Capability of Safety & Relief Valves to Operate Satisfactorily Under Operating & Accident Conditions.Interim Data Rept for EPRI PWR Safety & Relief Valve Test Program Sent in Project stage: Other ML20050B5681982-03-31031 March 1982 Advises That Evaluation of NUREG-0737,Item II.D.1 Re Testing of Pressurizer Code Safety & Power Operated Relief Valves Underway.Resolution Available for Required 820701 Submittal Project stage: Other ML20054L1831982-07-0101 July 1982 Responds to NUREG-0737,Item II.D.1 Re Pressurizer Code Safety & Pilot Operated Relief Valve Testing.Util Participated in EPRI Administered Safety & Relief Valve Testing Program.Evaluation to Be Submitted by 821231 Project stage: Other ML20128N8361982-09-30030 September 1982 Performance Test Program for Increased Blowdown on Crosby 4M16 HB-BP-86 Pressurizer Safety Valve Project stage: Other ML20070H7671982-12-17017 December 1982 Advises That Final Evaluation Re EPRI Relief & Safety Valve Testing Per NUREG-0737,Item II.D.1, Reliability Engineering, Will Not Be Submitted Until 830131.Summary of Evaluation Submitted Project stage: Other ML20070T0961983-02-0101 February 1983 Forwards Rev 0 to Davis-Besse Analysis & Evaluation of Safety/Relief Valve Discharge Sys Per NRC NUREG-0737, Technical Rept,In Response to Items II.D.1.2 & II.D.1.3 Project stage: Other ML20028G0701983-02-0202 February 1983 Forwards Response to 821227 Request for Info Re Plant Computer Sys & non-nuclear instrumentation-X Power Failure Project stage: Request ML20128N8071985-07-19019 July 1985 Provides Partial Response to 850607 Request for Addl Info Re NUREG-0737,Item II.D.1 Concerning Selection of Transients & Valve Inlet Conditions,Valve Operability & Analysis of Inlet & Discharge Piping Project stage: Request ML20137Y5621985-10-0101 October 1985 Forwards Response to Question 2 of 850719 Request for Addl Info Re NUREG-0737,Item II.B.1 Concerning Expected Blowdowns at Current Ring Settings.Actual Percent Blowdown of Safety Valves Has No Adverse Effect Upon Core Cooling Project stage: Request ML20138A7731985-12-0606 December 1985 Forwards Partial Response to 850607 Request for Addl Info Re NUREG-0737,Item II.D.1.Safety Valves Removed from Original Location in Valve Room to Direct Mount on Pressurizer Nozzles Project stage: Request 1982-09-30
[Table View] |
Text
TOLEDO Docket No. 50-346 License No. NPF-3 Roano P. CAOUSE Vce Preutsot Ndear Serial No. 800 mS 2-21 March 31, 1982
,-:= ;?.
f f?l 4
/
\\
Director of Nuclear Reactor Regulation
'9 b
Attention:
Mr. John F. Stolz J
s
. q'}' ig7gd,D s Operating Reactors Branch No. 4 a ' --
Division of Operating Reactors
- 3;'\\
ig die United States Nuclear Regulatory Commission
\\,-
J Washington, D. C. 20555 o>
Dear Mr. Stolz:
This letter is submitted in reference to Toledo Edison's evaluation of NUREG 0737, Clarification of TMI Action Plan, Item II.D.1.
This item deals with testing of pressurizer code safety and power operated relief valves (PORV). Toledo Edison participated in the planning and funding of the Electric Power Research Institute's (EPRI) Safety and Relief Valve Testing Program and has received the associated data. The specific valves installed at the Davis-Besse Nuclear Power Station Unit I were not tested by EPRI. However, the tests conducted were designed to bound the Davis-Besse actual configuration. Results were generally acceptable, but this bounding approach requires interpolation of test data be performed prior to any final conclusions regarding specific valve performance.
These evaluations are underway at Toledo Edison and a schedule for reso-lution of Item II.D.1 will be available for the required July 1, 1982 submittal.
Very truly yours, f::
RPC:MGF:rns C
1 cc: DB-1 Resident Inspector
/o 820406C063 820331 PDR ADOCK 05000346 P