Text
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 0
~IOOI PHILADELPHIA, PA.19101 01 Q
JOHN S KEMPER h
s,
,,,,,,,[',,"'l',,,",",',,,,,,
April 2, 2
a" ECEl,%,
0 11r. Dr rrell G. Eisenhut, Director 2
~'
APR 5 1982 g ppmc5?fj$ i~
Division of Licensing
' j' 1 Office of Nuclear Reactor Regulations W E;'
/d U.S. Nuclear Regulatory Commission Washington, DC 20555 f3 G-
Reference:
Limerick Generating Station, Units 1 & 2 5 l U Docket Nos. 50-352 and 50-353
Dear Mr. Eisenhut:
Your letter dated December 22, 1980, transmitted MUREG-0612,
" Control of Heavy Loads at Nuclear Power Plants - Resolution of TAP A-36", and requested that certain information be provided.
Our responses forwarding this information are as follows:
a.
The first part of the requested report which provided the informat. ion identified in Section 2.1 of Enclosure 3 was transmitted by our letter dated June 18, 1981.
b.
Our second submitral dated September 22, 1981 forwarded the eccond part of the requested report on information outlined in Section 2.2 and 2.3 of Enclosure 3.
c.
The attached submittal revises the original report including certain information and results of analyses which were not available at the time the September 22, 1982, documents were forwarded. The report is now complete with the exception of a few load drop analyses for loads handled over the reactor vessel.
These studies are presently l
being performed by our NSSS supplier and will be forwarded when the work is completed.
l Sincerely, lNF4l-~
l j
t 1
I /
8204060002 820402 DR ADOCK 05000352 PDR l