Text
-
.
W R 1 6 19 82
Docket No. 50-263(DEPOS)
0)
f
Northern States Power Company
- O
A'ITN:
Mr. Dennis E. Gilberts
S
NECg 'E
g
Senior Vice President
4p
D
,.e
Power Supply
p
tri
2 7g k
-
414 Nicollet Mall
-
%$%.eD* D
-
Minneapolis, MN 55401
iMN
9 f
Gentlemen:
A
IN
This refers to a special inspection conducted by Mr
this office on January 18 through 29,
. A. L. Madison of
Monticello Nuclear Generating Plant,
1982, of activities at the
findings with Mr. Wayne Shamla, Plant Superindent andand to the discussions of our
staff at the conclusion of the inspection.
others of your
This inspection of your prompt public notification /warni
conducted to determine whether your system as described i
ng system was
of December 22, 1981, has been installed and tested
n your letter
to determine if your system meets the full desi
Final judgment
.
Appendix 3 of NUREG-0654 will be made jointly by NRC a d FEMA
gn objectives of
near future.
n
in the
Our interim findings indicate that your system appea
requirements of 10 CFR 50, Appendix E, Section IV D 3
rs to meet the
. . .
The enclosed copy of our inspection report identifies
during the inspection.
areas examined
of a selective examination of procedures and representWithin these areas, the in
observations, and interviews with personnel.
ative records,
In accordance with 10 CFR 2.790 of the Commission's re
NRC's Public Document Room.of this letter and the enclosed inspection report will bg
e placed in the
that you (or your contractors) believe to be exIf this report contains any information
10 CFR 9.5(a)(4), it
empt from disclosure under
phone within ten (10) days from the date of this letter ofis necessary that you
-
your intention
9204050090 020316
DR ADOCK 0500
E-3f
b ' C*
ll
/
-
.- - _ _ -
.. -
,
l
.
,
!
1
MAR 1 6 - $82
J
h
i
o>
Docket No. 50-263(DEPOS)
T'
C
NECggTO
l
Northern States Power Company
0
,
ATfN:
Mr. Dennis E. Gilberts
4
-
Senior Vice President
jp
c
8
-
_
Power Supply
-
l
414 Nicollet Mall
ID*
,
,
' Minneapolis, MN 55401
1
>
0'
Gentlemen:
N
,
I
l
This refers to a special inspection conducted by Mr. A. L. Madison of
this office on January 18 through 29, 1982, of activities at the
,
Monticello Nuclear Generating Plant, and to the discussions of our-
'
findings with Mr. Wayne Shamla, Plant Superindent and others of your
staff at the conclusion of the inspection.
I
This inspection of your prompt public notification / warning system was
conducted to determine whether your system as described in your letter
of December 22, 1981, has been installed and tested. Final judgmont
to determine if your system meets the full design objectives of
Appendix 3 of NUREG-0654 will be made jointly by NRC and FEMA in the
near future.
l
Our interim findings indicate that your system' appears to meet the
4
requirements of 10 CFR 50, Appendix E, Section IV.D.3.
The enclosed copy of our inspection report identifies areas examined
<
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
j
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
'
of this letter and the enclosed inspection report will be placed in the
.
NRC's Public Document Room.
If this report contains any information
'
that you (or your contractors) believe to be exempt from disclosure under
.
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
'
phone within ten (10) days from the date of this letter of your intention
,
I
i
d
l
0204050090 820316
DR ADOCK 0500 M
E - 3f
9p
- _ __ --
-
.
- -
- -
. .
_ ..
.
._
.
d
.
.
Northern States Power Company
2
VAP 1 6 LO2;
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to oc withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4).
The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
b
C.
. Pap ic11o, Chief
l
Program Support Branch
Enclosure:
Inspection
,
Report No. 50-263/82-02(DEPOS)
,
cc w/ enc 1:
W. A. Shamla, Plant Manager
'
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Monticello
Resident Inspector, RIII Prairie
Island
John W. Ferman, Ph.D., Nuclear
'
Engineer, MPCA
RIII
RIII
RIII
_
qqg,y
%.
Pattbrson/jp
Ax 4 on
Pa riello
NePson
3/9/82
gg
i
j
. - .
- -
-
-
-_
- -.
.
-
-
,
, - - ,