March 23, 1982 (3
BLRD-50-438/82-18 BLRD-50-439/82-17 Q
I k
//
~
U.S. Nuclear Regulatory Commiasion D,
Region II p'e,s Attn:
Mr. James P. O'Reilly, Regional Administrator E
.NSD 9
101 Marietta Street, Suite 3100 APRy Atlanta, Georgia 30303 6 "$g'
- ~p
Dear Mr. O'Reilly:
h, n y" m m t [
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SMALL VALVES IN THE AU LIAlii)T FEEDWATER SYSTEM EXCEED WEIGHT AND LENGTH LIMITATIONS - BLRD BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on February 22, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8206. Enclosed is our first interim report. We expect to submit our next report by July 9, 1982.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY
'. WR L. F. Mills, Manager Nuclear Regulation and Safety Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 OIT(GAL COPt.
TC A7 8204020559 B20323 r/
PDR ADOCK 05000 g
S An Equal Opportunity Employer
i l
e I
{
ENCLOSURE i
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 SNMLL VALVES IN THE AUXILIARY FEEDWATER SYSTEM EXCEED WEIGHT AND LENGTH LIMITATIONS BLRD-50-438/82-18, BLRD-50-439/82-17 I
10 CFR 50.55(e) i FIRST INTERIM REPORT f
J P
Description of Deficiency
' This deficiency concerns 1-and 1/2-inch globe valves which are installed in the Auxiliary Feedwater System in accordance with design drawings I
( 3BWO418-CA - series). The weight and end-to-end dimensions of those valves exceeded the system piping seismic analysis limits of design drawings 3BA0005-00-01 and 3BA0006-00-1 (typical drawing).
Interim Progress TVA has identified replacement valves that will meet the design i
e parameters of 3BA0005-00-1 and 3BA0006-00-1. The following drawings l
have been revised for unit 1-J 1.
Auxiliary Feedwater System drawings 3BWO418-CA-01 through -06
\\
l 2.
NAVC0 drawings A-8526 through A-8535, A8546, A-8547, and A-8549 3
Design criteria diagram 3BWO618-CA-01 4
TVA will revise the unit 2 drawings to reflect the correct valve weights and lengths.