ML20050A976

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/82-08 on 820216-18.No Noncompliance Noted
ML20050A976
Person / Time
Site: Pilgrim
Issue date: 03/19/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20050A977 List:
References
NUDOCS 8204020466
Download: ML20050A976 (2)


See also: IR 05000293/1982008

Text

-

p 4

A f ' k N.s

.

.

MRig

Docket No. 50-293

s

g

Boston Edison Company M/C Nuclear

c;

ATTN: Mr. William D. Harrington

S

nECE!VED g

-

Senior Vice President, Nuclear

s

800 Boylston Street

APRI

1982 a-

-

Boston, Massachusetts 02199

%

a:m ,m, em:c

y'

c:.a vr.o.ie it

i,

['

Gentlemen:

O

Subject:

Inspection No. 50-293/82-08

'b

This refers to the roetine safety inspection conducted by Mr. A. Finkel of

this office on February 16-18, 1982 at Pilgrim Nuclear Power Station, Plymouth,

Massachusetts of activities authorized by NRC License No. DPR-35 and to the

discussions of our findings held by Mr. Finkel with Mr. R. Machon and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date'of this letter.

Such application must be cor.sistent with the requirements

of 2.790(b)(1).

The telephone notification of your intent to request withholding,

or any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

ISIrtsrga n % g 6 CA4

.

Thomas T. Martin, Director

Division of Engineering and Technical

Programs

i

!

Jt/RI:0ETP

6

Finkel/ gwc 1 ,RI:DETP

M

Ebneter

)f3/11/82

3 fb

0FFICIAL RECORD COPY

l

f

B204020466 820319

i

PDR ADOCK 05000293

0

Q

PDR

-kr r

-

.

.

Boston Edison Company M/C Nuclear

2

Enclosure:

NRC Region I Inspection Report No. 50-293/82-08

cc w/ enc 1:

A. V. Morist, Manager, Nuclear Operations Support

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Massachusetts (2)

NRC Resident Inspector

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encls)

T. C. Elasser

0FFICIAL RECORD COPY