Forwards IE Insp Rept 50-213/82-05 on 820208-12.No Noncompliance Noted
ML20050A732
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/19/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20050A733 List:
References
NUDOCS 8204020201
Download: ML20050A732 (2)


See also: IR 05000213/1982005

Text

. _ .

,_ _

._

..

,

'

,

'

.

..

_ . ,

,

i

s

i

l.

.

N 1 9 1982

'

i.

.

u

.

!

,

.

Docket No. 50-213

1

N

,

'1

Connecticut Yankee Atomic Power Company

g

ATTN: Mr. W. G. Counsil

- s

-

.

y

!

a Senior Vice tresident - Nuclear

t

Engineering and Operations

/fe s

'

P. O. Box 270

N4

-

-

s

  1. Dy

$

Hartford, Connecticut' :06101

<

f{

D k W , ISO Q :

,

.

.

Gentlemen:

A

%g%,

g

\\

-4

t

.

Subject:

Inspectir

3/82-05

~~

h

./ /

,

Dr

Y

This refers to the routine safetyN nspection conducted by Mr. C. Petrone p y'

g

of

'

this office on February 8-12, 1982, at Haddam Neck Nuclear Power Station,

-

k Haddam Neck, Connecticut, of activities authorized by NRC License No. DPR-61

+

, Qnd to the discussions of our findings held by Dr. J. Chung of this office

!

with Mr. R. Graves and members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Regicn I Inspection

i Report which is enclosed with this letter. Within these areas, the inspection

i

. ' consisted of selective examinations of procedures and representative records,

'

N interviews with personnel, and observations by1-the inspector.

.s x

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790(a), a. copy of this letter and the enclosure

.

will be placed in the NRC Public Document-Room unless you notify this office,

'

by telephone, within ten days of the date' of this, letter and submit written

application to withhold information c~ont'at' led therein within thirty days of

s

the date of this letter.

Such applicathn must be consistent with the require-

monts of 23790(b)(1).

The telephone notification of your intent to request

-

>

JMthholding, or any request for an' extension of the 10 day period which you

, believe necessary, should be made to-tb;e Suo,ervisar, Files, Mail and Records,

,[

USNRC Region I, at (215) 337-5223.

E

~ '

-

'

,

No reply to'this letter is required. Your cooperation with us in this matter

is appreciated.

j

,

1

<

M , Sincerely,

s

-

!

.

U'*tiL'b_4if1.mi

'(JMrv

hizh,

'

,

$$0*A$8ER*o!!88s?3

/ Thomas T. Martin, Director

1

G

h-

//,

Division of Engineering and Technical

PDR

Programs

,

' Enclosure:

NRC Region I Inspection Report Number 50-213/82-05

A

RI:EIB

RI:EIB

RI:EIB

RI:EIB

j

P.etrone/cgl

Chung

Bettenhausen

Ebnfter

l

x /8/82

3/ 'l /82

3/ h/82

3/6 /82

-

3

-' '

Qj

0

AL RECORD COPY

v

,

O

/

'

~;

a

-

.

-

.

. - .

-

.

.

-

.

. .--

.__

_ _ _ _ .

. _ . _ _ - _ - _

.

__ _

_ __ _ _

.

..

-

o

e

t

Connecticut Yankee Atomic Power

2

Company

'

-

cc w/ enc 1:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation facilities Licensing

J. F. Opeka, Vice President, Nuclear Operations

Public Document Room (PDR)

1

l

Local Public Document Room (LPDR)

~

Nuclear Safety Information Center (NSIC)

j

NRC Resident Inspector

!

State of Connecticut

Lcc.w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o enc 1)

T. C. Elsasser

.

b

!

!

l

!

0FFICIAL RECORD COPY

,

i

!

-._. _,

_

. _ _ _ _ _

._

__

__.

_

_

_ _ _ _ _ - - _

_