ML20050A613

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-324/82-01 & 50-325/82-01 on 811215-820115 & Notices of Violation & Deviation
ML20050A613
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/09/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20050A610 List:
References
NUDOCS 8204010495
Download: ML20050A613 (2)


See also: IR 05000324/1982001

Text

__

_

_

..

..

t

, i D u]

.

,

FEB 0 9 G82

Carolina Power and Light Company

ATTN: Mr. J. A. Jones, Senior Executive

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

Subject: Report Nos.624/82-Dnd 50-325/82-01

This refers to the routine safety inspection conducted by Mr. L. W. Garner of

this office on December 15, 1981 - January 15, 1982, of activities authorized by

NRC Operating License Nos. DPR-71 and DPR-62 for the Brunswick facility.

Our

preliminary findings were discussed with fir. C. R. Dietz, Plant flanager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

During the inspection it was found that certain activities under your license

appeared to deviate from commitments made to the commission and have safety

significance. This item is identified in the Notice of Deviation enclosed herewith

as Appendix B.

Please provide us in writing within 30 days of your receipt of

this letter your comments including a description of corrective actions that have

been or will be taken, corrective actions which will be taken to avoid further

deviations, and the date your corrective actions were or will be completed.

One new unresolved item is identified in the enclosed inspection report.

This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

.

of.2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL- 96-511.

NNf>N

O

G

..

..

,

Carolina Power and Light Company

2

FEB Us

. . . .

Should you have any questions concerning this letter, we will be

ad to discuss

s

them with you.

Sincerely,

R. C. Lewis, Director

Division of Resident and thactor

Project Inspection

Enclosures:

1.

Appendix A, flotice of Violation

2.

Appendix B, flotice of Deviation

3.

Inspe.ction Report flos. 50-324/82-01

and 50-325/82-01

cc w/ encl:

C. R. Dietz, Plant flanager

bcc w/ enc 1:

Resident Inspector

Document 11anagement Branch

State of florth Carolina

,

l.J1l

77-

/

RII

P.II

RII

7

r2 h~

c%

b

LG5 Hidr:dt

CJulian

TBurger

FSCantrell g

2/9/82

2/4/82

2///82

2/cf/82

J