._ ._.
40\\~due'
-
-
'
I
'
UrJITCD ST ATCS
N
-
ATCMIC C;;tRGY CCMMIGS
!
/g / ., , 'Qs
'
'
oinicie...t. or ni ..... a ion e oes u s e.oe.s
':}
. . - -
? i M, /3./
nu,.o
.
.i
su rAns t.vcnuc
.,
.
xir4c or ruussi A. r>crar4;rt.vAsr A 19:n
' .;, .u@'
.
.
NOV 2 9 374
.
Consolidated Edisen Co:pany of New York, Inc.
License Nos. DPR-5
Attention: Mr. U. J. Cahill, Jr.
Vice President
CPPR-62
4 Irving Place
~Insp. Nos. 50-3/74-14
10003
50-217/14 1'.
(50-286/74-19]
Centlemen:
.
I
This refers to the inspection conducted by Mr. Borcs of this office
on October 21-24 and 30-31,1974 at the Indian Point Nuclear Generating
Station, Buchanan, New York of activities authorized by AEC License
Nos. DPR-5, DPR-26 and CPPR-62 and to the discussions of our findings
held by Mr. Beres with Messrs. Stein and VanUyck and other members of
your staff at the conclusien of the inspection.
Arcas examined during this inspection are described in the Regulatory
Operations Inspection Report uhich is enclosed with this letter.
Within these areas, the inspection consisted of selcetive examinations
of procedures and representative records, intervicus with personnel.
u..; eL ucvutions by the inspector.
Ou'r inspector also verified the steps you had taken to correct the
violations brought to your attention in a letter dated August 2, 1973
follouing our last inspection.
He have no further question regarding
these matters.
t
With respect to Construction Permit No. CPPR-62, uithin the scope of
this inspection, no violations or safety items uere observed.
Houcver,
with respect to License Nos. DPR-5 and DPR-26, during this inspection,
it was found that certain of your activities appeared to be in
violation of AEC requircaents.
The itens- and references to the
pcrtinent requircmants are listed in the enclosure to this letter.
This lettur constitutes a notice sont to you pursuant to the provisions
of Section 2.201 of the AEC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations. Section 2.201 requires you te
submit to this office within 20 days of your receipt of this notice,
a uritten statcmant of enplanation in reply, including: (1) corrective
steps which have been or vill be taken by you, and the results
achieved; (2) ' corrective steps which ulll be taken to avoid.further
violations ; and (.';
the date uhen full compliance will be achieved.
/,
Sb 3; 1
.~.f
.
,
vi 's
-
t
.
8203310660 741129
-
PDR ADOCK 05000003
Q
.
.
_
_
_
_._
..
-. _
_
_ .
,
'
.
,
.
.
.
.
,
' 2-
-
,
.
.
In accord:nce with Section 2.790 of the AEC's " Rules of Practice",
Part 2, Titic 10, Ccde of Federal Resulaticas, a copy of this
letter and the encleced inspectica report vill be placed in the
AEC's Public Dccunent Roca.
If this report contains any information
!
that you (or your contractor) believe to be proprietary, it is
necessary that you taho a uritten application uithin 20 days to
this office to withhold such information frca public disclosure.
i
.
.Any such applicatien cust include a. full statement of the
!
.
reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a
separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be
placed in the Public Document Room.
i
Should you have sny questions concerning this inspection, we will
be pleased to discuss then with you.
-
.
Siscerely,
.
s
Li
, ./
?
~
1
c
,
Paul R. Nelson, Chief
Radiological & Environmental
Protection Branch
Enclosurcs:
'l.
Description of Violations
2.
RO Inspection Report Nos. 50-3/74-14,
50-247/74-14 and 50-236/74-19
i
cc:
A..E.'Upton, Esquire
I
i
A. Kohler, Resident Construction Manager
W. Stein, Manager, Nuclear Pouar Generation Department
J. Makepcace, Chief Engineer Unit 2
-
S. Cantone, Chief Engineer Unit 3
A. Z. Roisman, Counsel for Citizens Committee for Protection
- of the Environment O!ithout Report)
.
5
9
W-
, . -
.,,
.
-
_ , . - .
-
- .
_
_
-
-
_
_
_
. _ _ _
. - -
,
G
3
-
o
,
.
.
.
.
.
.
.
3
,
!
- bec: Ph Chicf, T5T,D
RO:UQ (/: cpys of 1tr., 5 crys of rep.crt)
RO Tili..
Central :hil J. Piles
DL (4 cpys of ltr.,13 cpyn of report)
,
RS (1 cpy of ltr., 3 cry; of report)
,
Local PDR
i
State of Ucu York
Reg Reg Readinc, Roca
RO Directors (II, III, IV) (Report Only)
A. Z. T.oisr.u , Counsel for Citizens Cot:11ttee for Protection of the