ML20050A263
| ML20050A263 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/31/1977 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | William Cahill CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| Shared Package | |
| ML20050A264 | List: |
| References | |
| NUDOCS 8203310653 | |
| Download: ML20050A263 (3) | |
See also: IR 05000003/1977001
Text
r
-
- - - -
,
"*
.
.
8
UNITED STATES
gj
.
c
NUCLEAR REGULATORY COMMISSION
'
jj7)4
,g
.
.
j
REGION I
'
p'
f
631 PARK AVENUE
7
IEFEE COPY
f
KING OF PR US$1 A PENNSYLV ANI A 19406
MAR 311977
Docket Nos. 50-03
50_-247.,
do-286 5
Consolidated Edison Company of
New York, Inc.
ATTN: Mr. W. J. Cahill, Jr.
Vice President
4 Irving Place
,
Gentl emen:
Subject:
Inspection 50-03/77-01, 50-247/77-02, and 50-286/77-03
This refers to the inspection conducted by Mr. D. R. Neely of this
office on February 2-4 and 16-18,1977, at Buchanan, New York, of activ-
ities authorized by NRC License Nos. DPR-5, DPR-26, and DPR-64 and to
the discussions of our findings held by Mr. Neely with Messrs. Caldwell
and Kessig and other members of your staff at the conclusion of the
inspection, and to subsequent telephone discussions between Messrs.
Neely and Streeter of this office and Messrs. McGrath, Makepeace,
Shatkouski, and Wisla of your staff on March 8,1977, and between Mr.
Streeter and Mr. Shatkouski on March 9,1977.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspecto r.
Based on the results of this inspection, it appears that_ one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974. This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
8203310653 770331
PDR /4 DOCK 05000003
O
PER
.
.
.
Consolidated Edison Company of
2
New York, Inc.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full com-
pliance will be achieved.
We understand that your upgrading training of all health physics tech-
nicians was to be completed March 11, 1977.
We also understand that
future retraining of station health physics technicians will be accom-
plished in accordance with a program to be developed and documented by
September 1,1977, and the first retraining cycle will be completed by
March 31,1978.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such
information from public disclosure. Any such application must be accom-
panied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains
a statement of reasons which addresses tith specificity the items which
will be considered by the Commission as listed in subparagraph (b)(4) of
Section 2.790.
The information sought to be withheld shall be incorpor-
ated as far as possible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
b
McL
ames P. O' Reilly
D rector
__
_
l.
-
.
-
.
i
.
i
j.
Consolidated Edison Company of
3
l
New York Inc.
I
F
i
i
Enclosures:
1.
Appendix A. Notice of Violation
.
'
2.
Office of Inspection and Enforcement Inspection Report No.
50-03/77-01, 50-247/77-02, and 50-286/77-03
l
'
ec w/encls:
L. O. Brooks, Project Idanager IP Nuclea;- (con Ed)
'
E. Kessig. Acting Mananer, Nuclear Power Generation Department (Con Ed)
T. Law,PlantManager(Coned)
J. M. Mahepeace, Director, Technic .
Lvering (Con Ed)
L. M. Troston, Esquire (Representing N Ea)
George T. Berry, General flanager and Chief Engineer (PASNY)
Z. E. Chilazi, Manager of Projects, Themal Power Generation (PASNY)
A. Z. Roisaan, Counsel for Citizens Committee for
Protection of the Envirompent (Without Report)
bec w/encls:
i
,
IE Mail & Files (For Appropriate Distribution)
Central Files
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Technical Information Center (TIC)
REG:I Reading Room
Region Directors (II, III, IV) (Report Only)